Site Final | 8/30/2013 | 8/30/2013 | 8/30/2013 | P | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/29/2013 | 8/29/2013 | 8/30/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 7/29/2013 | 7/29/2013 | 7/29/2013 | | PART |
Kimberly M. Johnson
|
|
|
Masons were washing tools in wheelbarrow over gutter. Asked them to relocate wash station to ground on lot where it cannot runoff into gutter or storm drain
|
General Inspection | 6/27/2013 | 6/27/2013 | 6/27/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/27/2013 | 5/27/2013 | 5/28/2013 | | CANC |
Kimberly M. Johnson
|
|
|
|
General Inspection | 4/26/2013 | 4/26/2013 | 5/3/2013 | | PASS |
Tony Young
|
|
|
|
General Inspection | 3/25/2013 | 3/26/2013 | 3/26/2013 | A | CANC |
Clint A Smith
|
|
|
|
General Inspection | 3/25/2013 | 3/25/2013 | 3/25/2013 | | PEND |
Daryl Spivey
|
|
|
Sent to Clint for reinspection per Clint. Was failed by Clint in Feb. for porta potty on sidewalk. Porta potty is still on sidewalk ............ds
|
General Inspection | 2/21/2013 | 2/21/2013 | 2/21/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal message to RP; Relocate porter potty off of the sidewalk and place and secure it to the lot.
|
General Inspection | 1/21/2013 | 1/21/2013 | 1/22/2013 | | CANC |
Kimberly M. Johnson
|
|
|
Holiday
|
General Inspection | 12/18/2012 | 12/21/2012 | 12/21/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/18/2012 | 12/18/2012 | 12/18/2012 | | FAIL |
Clint A Smith
|
|
|
Message to RP: Clean paint washout next to the trash debri container. Will re-inspect on 12/21/2012
|
BMP Violation | 11/15/2012 | 11/16/2012 | 11/16/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/15/2012 | 11/15/2012 | 11/15/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Maintain perimeter sediment controls at bottom of slope. Will re-inspect on 11/16/2012
|
General Inspection | 10/15/2012 | 10/15/2012 | 10/17/2012 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 9/18/2012 | 9/18/2012 | 9/18/2012 | | PASS |
Daryl Spivey
|
|
|
|
BMP Violation | 8/13/2012 | 8/16/2012 | 8/17/2012 | P | PART |
Clint A Smith
|
|
|
Sediment barriers installed, but the Placement should be located at the bottom of the slope. Left a message with the RP to contact to discuss over relocation.
|
Site Preparation | 8/13/2012 | 8/13/2012 | 8/13/2012 | | FAIL |
Clint A Smith
|
|
|
Notice Posted 1. Install perimeter control per industry / manufacture specifications. 2. Remove structural controls out of the Right~A~Way. 3. Post ESC sign where visabl from the street. Failure to comply with the given notice will result in further enforcement. Will re-inspect on 8/16/2012 PM.
|