General Inspection | 10/22/2013 | 10/22/2013 | 10/22/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 10/22/2013 | 10/22/2013 | 10/22/2013 | P | PASS |
Andy J. Long
|
|
|
Project complete and stabilized. Inlet protection remains on one on-site drainage structure (sand/oil trap inside rocky swale with french drain). All other drains for impermaeble surface unobstructed. ESC requirements satisfied. All other permits were already finaled.
|
General Inspection | 9/6/2013 | 9/6/2013 | 9/10/2013 | | PASS |
Daryl DeGrange
|
|
|
|
General Inspection | 7/22/2013 | 7/22/2013 | 7/22/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Vacant lots stabilized with pea gravel. Must remove witch's hat before permit can be finaled
|
General Inspection | 6/4/2013 | 6/4/2013 | 6/4/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP; Stabilize the two other lot portions so the permit can be finaled out
|
General Inspection | 4/19/2013 | 4/19/2013 | 4/19/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/15/2013 | 1/15/2013 | 1/15/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 11/27/2012 | 11/27/2012 | 11/27/2012 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 11/9/2012 | 11/9/2012 | 11/9/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 10/30/2012 | 10/30/2012 | 10/30/2012 | | PASS |
Clint A Smith
|
|
|
|