Site Final | 3/27/2013 | 3/27/2013 | 3/27/2013 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/27/2013 | 3/27/2013 | 3/27/2013 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 3/14/2013 | 3/14/2013 | 3/14/2013 | | PASS |
Rock A. Hudson
|
|
|
|
General Inspection | 2/11/2013 | 2/11/2013 | 2/11/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 1/11/2013 | 1/11/2013 | 1/11/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/11/2012 | 12/11/2012 | 12/18/2012 | | PASS |
Dixie Fellows
|
|
|
all ok
|
General Inspection | 11/9/2012 | 11/9/2012 | 11/9/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/9/2012 | 10/9/2012 | 10/9/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 9/7/2012 | 9/7/2012 | 9/10/2012 | | PASS |
Kimberly M. Johnson
|
|
|
Backyard rough grading left a berm at the edge of disturbance. This area may need perimeter control when re-graded.
|
BMP Violation | 8/2/2012 | 8/3/2012 | 8/6/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/31/2012 | 7/31/2012 | 8/2/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Remove all concrete residual washout off of the slope surface. Provide a washout for any further washout activities. Will reinsoect on 8/3/2012
|