General Inspection | 3/6/2014 | 3/6/2014 | 3/6/2014 | | PASS |
Andy J. Long
|
|
|
|
DOC - Permit Finaled | 3/6/2014 | 3/6/2014 | 3/6/2014 | P | PASS |
Andy J. Long
|
|
|
Entire Timberside phase is developed with infrastructure and homes on individual houses. No further ESC inspections required.
|
General Inspection | 2/3/2014 | 2/3/2014 | 2/3/2014 | | PASS |
Andy J. Long
|
|
|
Perimeter BMPs and washouts in good condition. Streets are clean, drop inlet bags with remaining capacity. Individual lots have seperate permits. Approved.
|
General Inspection | 1/2/2014 | 1/2/2014 | 1/2/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/2/2013 | 12/2/2013 | 12/2/2013 | | PASS |
Andy J. Long
|
|
|
Subdivision development and infrastructure complete. Keep permit open to check on vertical construction by Hunter Homes.
|
Random Inspection | 10/31/2013 | 10/31/2013 | 10/31/2013 | P | PART |
Andy J. Long
|
|
|
Cement washout access is muddy and resulting in track out. Talked to Hunter Homes RP Rollo Bird and requested that more rock material (construction entrance) be placed around washout. The washout is actually in Timberside phase 2. Will reinspect when back in area.
|
General Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 | | PASS |
Andy J. Long
|
|
|
This is a subdivision permit (south of Hardesty from Wise to Honeycomb . All streets and infrastructure is complete. BMPs still installed for unstabilized sites. Many individual projects are underway.
|
General Inspection | 9/23/2013 | 9/23/2013 | 9/23/2013 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/22/2013 | 8/22/2013 | 8/22/2013 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 7/22/2013 | 7/22/2013 | 7/22/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 6/20/2013 | 6/20/2013 | 6/20/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/20/2013 | 5/20/2013 | 5/20/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/19/2013 | 4/19/2013 | 4/19/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/19/2013 | 3/19/2013 | 3/19/2013 | | PASS |
Clint A Smith
|
|
|
Vegitation is becoming established on the areas where vertical construction is not occuring. Sediment barriers looking good.
|
General Inspection | 2/15/2013 | 2/15/2013 | 2/15/2013 | | PASS |
Rock A. Hudson
|
|
|
|
General Inspection | 1/15/2013 | 1/15/2013 | 1/15/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/14/2012 | 12/14/2012 | 12/14/2012 | | PART |
Clint A Smith
|
|
|
They have applied a tach, seed, and mulch mixture on all of the disturbed soil.
|
General Inspection | 11/13/2012 | 11/13/2012 | 11/13/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/6/2012 | 10/10/2012 | 10/11/2012 | A | PASS |
Kimberly M. Johnson
|
|
|
Area of concern along Wise Way is still under active construction. No rain in forecast at time of inspection
|
General Inspection | 10/5/2012 | 10/5/2012 | 10/6/2012 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: After the conversation over the project schedule; if the area between the back of the curb and sidewalk is not sttabilized by 10/16/2012 or in this period of time there is a potental for precipetation the RP must have sediment barriers installed. Also at this time all storm drains efffected by the development must be protected with an approve storm drain inlet protection. Will follow up on 10/10/2012 for project status progress.
|
General Inspection | 9/18/2012 | 9/18/2012 | 9/18/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/16/2012 | 8/16/2012 | 8/17/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/13/2012 | 7/16/2012 | 7/16/2012 | A | NR |
Clint A Smith
|
|
|
Have begun to stage equipment.
|
Site Preparation | 7/13/2012 | 7/13/2012 | 7/13/2012 | | NR |
Clint A Smith
|
|
|
|