Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC12-00678
StatusFinaled
Name KEVIN AMAR
Site Address 1527 W ALEXANDRA LN
Project Name4 plex
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final12/18/201212/18/201212/18/2012ADONE
DetailsJim Storey
DOC - Permit Finaled12/18/201212/18/201212/18/2012PPASS
DetailsJim Storey
Site Final12/17/201212/17/201212/17/2012PNR
DetailsJim Sly
Kevin phone
Site Final12/14/201212/14/201212/14/2012PDEFR
DetailsJim Storey
Random Inspection11/19/201211/19/201211/19/2012PPASS
DetailsJim Storey
Random Inspection11/8/201211/9/201211/9/2012APASS
DetailsJim Storey
Random Inspection11/6/201211/6/201211/6/2012APASS
DetailsJim Storey
BMP Violation10/15/201210/17/201210/17/2012PPASS
DetailsEric Strole
Random Inspection10/15/201210/16/201210/16/2012APASS
DetailsJim Storey
General Inspection10/12/201210/15/201210/15/2012AFAIL
DetailsEric Strole
NEED TO CLEAN UP ALL SEDIMENT AND DEBRIS OFF ALL HARD SURFACES AND CLEAN UP ALL TRASH THROUGH OUT SITE AND PUT IN TRASH CONTAINER. PROVIDE TRASH CONTAINER. NEEDS TO BE COMPLETE BY 10-17-12 AM. WILL REINSPECT ON 10-17-12 PM. FAILURE TO COMPLY MAY RESULT IN FURTHER INFORCEMENT.
Random Inspection10/4/201210/4/201210/4/2012APASS
DetailsJim Storey
BMP Violation9/26/20129/28/201210/1/2012APASS
DetailsClint A Smith
BMP Violation9/26/20129/26/20129/26/2012AFAIL
DetailsClint A Smith
CORRECTION NOTICE:
Per BMC 8-17, your site is in violation. Correct by 9/27/2012 PM.

1. Clean up all sediment and debris off of all hard surfaces.
2.Provide trash containers for all construction trash debris.
3. Clean up all trash debris scattered throughout the project areas.

*Failure to comply with notice will result in a Stop Work Order. Will re-inspect on 9/28/2012
BMP Violation9/6/20129/7/20129/7/2012PPASS
DetailsEric Strole
BMP Violation9/6/20129/6/20129/6/2012AFAIL
DetailsEric Strole
left verbal message via voice mail and written correction to post esc sign, clean up dirt and debris off all hard surfaces and provide a concrete washout and clean up concrete that was washed out on ground and not in wash out pit. need to complete by 9-7-12 am. will reinspect on 9-7-12 pm.
Random Inspection8/31/20128/31/20128/31/2012PPASS
DetailsJim Storey
Site Preparation8/27/20128/27/20128/27/2012 NR
DetailsClint A Smith