General Inspection | 11/16/2012 | 11/16/2012 | 11/16/2012 | | DONE |
Clint A Smith
|
|
|
permit finaled
|
DOC - Permit Finaled | 11/16/2012 | 11/16/2012 | 11/16/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/16/2012 | 10/16/2012 | 10/18/2012 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 9/12/2012 | 9/13/2012 | 9/13/2012 | A | PASS |
Tony Young
|
|
|
|
Site Preparation | 9/12/2012 | 9/12/2012 | 9/12/2012 | P | FAIL |
Tony Young
|
|
|
called RP,, need to protect hill side along road,, sweep up put BMPs back in place,, post sign
|