Site Final | 1/14/2013 | 1/14/2013 | 1/14/2013 | P | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 1/14/2013 | 1/14/2013 | 1/14/2013 | P | PASS |
Jim Storey
|
|
|
|
Site Final | 1/14/2013 | 1/14/2013 | 1/14/2013 | A | NR |
Jim Storey
|
|
|
|
General Inspection | 1/1/2013 | 1/1/2013 | 1/3/2013 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 11/16/2012 | 11/16/2012 | 11/16/2012 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 11/13/2012 | 11/13/2012 | 11/13/2012 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 10/18/2012 | 10/18/2012 | 10/18/2012 | P | PASS |
Jim Storey
|
|
|
|
BMP Violation | 9/26/2012 | 9/28/2012 | 10/1/2012 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 9/26/2012 | 9/26/2012 | 9/26/2012 | A | FAIL |
Clint A Smith
|
|
|
CORRECTION NOTICE: Per BMC 8-17, your site is in violation. Correct by 9/27/2012 PM.
1. Clean up all sediment and debris off of all hard surfaces. 2.Provide trash containers for all construction trash debris. 3. Clean up all trash debris scattered throughout the project areas.
*Failure to comply with notice will result in a Stop Work Order. Will re-inspect on 9/28/2012
|
Random Inspection | 9/20/2012 | 9/20/2012 | 9/20/2012 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 9/19/2012 | 9/19/2012 | 9/19/2012 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 8/27/2012 | 8/27/2012 | 8/27/2012 | | NR |
Clint A Smith
|
|
|
|