Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberESC12-00738
StatusFinaled
Name GREG WILSTEAD
Site Address 11828 W FAIRVIEW AVE
Project NameCLOVERLEAF PLAZA 4PLEX UNITS
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection5/21/20135/21/20135/21/2013 DONE
DetailsClint A Smith
Permit finaled
DOC - Permit Finaled5/21/20135/21/20135/21/2013PPASS
DetailsClint A Smith
General Inspection4/2/20134/2/20134/3/2013 FAIL
DetailsClint A Smith
Message to RP:
Clean up all ahrd surface of all sediemtn and debris.
Site Final2/15/20132/15/20132/15/2013PFAIL
DetailsJim Sly
Need to complete landscaping..
General Inspection1/4/20131/4/20131/4/2013 PASS
DetailsClint A Smith
BMP Violation11/16/201211/19/201211/19/2012APASS
DetailsClint A Smith
BMP Violation11/15/201211/16/201211/16/2012PPART
DetailsClint A Smith
Curbing is being complete. RP must clean ip all hard surfaces and maintain d.i.s. Will follow up on 11/19/2012.
BMP Violation11/13/201211/15/201211/15/2012PFAIL
DetailsClint A Smith
Final notice:
Curbing should in place on 11/16/2012. Curbing barrier is a acceptable barrier for sediment control. Prio to placing the curbing, the ashpalt must be clean and free of all sediment. Explained to the RP that above ground inlet protection (gator gaurds) are not a accepted protection if curbing is not poured due to the foam type material and in not being weighted down adaquitely and there are gaps underneeth the gator gaurd thaty could allow sediment laiden water could migrate in those gaps if water is used for cleaning of the ashalt of if potental rain events occur. Will re-inspect on 11/16/2012 for sediment barriers. If barriers are not in place, a Stop work Order will be issued.
BMP Violation11/8/201211/13/201211/13/2012AFAIL
DetailsClint A Smith
2nd Notice:
Install sediment barrier along all disturbed soils back behind the asphalt where a potential turbid discharge could occur.
**Failure to comply with the second notice, will result in a Stop Work Order.
Will re-inspect on 11/15/2012 PM.
BMP Violation11/8/201211/8/201211/8/2012PFAIL
DetailsClint A Smith
Correction Notice: (Given to Pat Palmer)
1. Provide sediment barriers along asphalt and disturbed soil where there is a potental for turbid run off.
2. Maintain and clean up all sediment off of the hard surfaces.
3. Provide rhe valid RP on signage. If the RP has changed, update the city with a valid RP.
Site Preparation10/18/201210/18/201210/18/2012PPART
DetailsJim Sly
Greg phone
Notified RP....Need sign.
Site Preparation9/20/20129/20/20129/21/2012 NR
DetailsClint A Smith