DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection6/29/20156/29/20156/29/2015 PASS
DetailsEvan Jenkins
DOC - Permit Finaled6/29/20156/29/20156/29/2015PPASS
DetailsEvan Jenkins
Complete
ESC Conditions Satisfied
General Inspection6/12/20156/12/20156/12/2015 PEND
DetailsEvan Jenkins
remove temp bmp's
General Inspection5/28/20155/28/20155/28/2015 PEND
DetailsEvan Jenkins
remove temp bmp's
General Inspection5/13/20155/13/20155/13/2015 PEND
DetailsEvan Jenkins
Home Complete
Waiting for Contractor to pull Temporary BMP's prior to Finaling out ESC permit
General Inspection4/28/20154/28/20154/28/2015 PASS
DetailsEvan Jenkins
General Inspection4/13/20154/13/20154/13/2015 PASS
DetailsEvan Jenkins
House is occupied. Temp BMP's still in place and needs to be removed prior to closing out ESC permit
General Inspection3/27/20153/27/20153/27/2015 PASS
DetailsEvan Jenkins
Temp BMP's need to be removed
General Inspection3/12/20153/12/20153/12/2015 PASS
DetailsEvan Jenkins
home complete
waiting for final stabilization
General Inspection2/25/20152/25/20152/25/2015 PASS
DetailsEvan Jenkins
waiting for vegetation establishment
General Inspection2/10/20152/10/20152/10/2015 PASS
DetailsEvan Jenkins
Home is complete. Temp BMP's are in place. Perminant stabilization needs to take place prior to ESC permit being closed
General Inspection1/26/20151/26/20151/26/2015 PASS
DetailsEvan Jenkins
Drop Inlet still has witches hat in it, and also the erosion blanket is still in place along steep hillside along hill rd. permit will be closed once perminant stabilization is acheived and temporary BMP's are removed. All other permits are finaled
General Inspection1/9/20151/9/20151/9/2015 PASS
DetailsEvan Jenkins
Home near completion. Re-vegetation needs to be established and BMP along hillside need to be removed
General Inspection12/25/201412/25/201412/26/2014 CANC
DetailsAndy J. Long
General Inspection12/10/201412/10/201412/10/2014 PASS
DetailsEvan Jenkins
WIP: No ESC Issues at this time
General Inspection11/25/201411/25/201411/25/2014 PASS
DetailsEvan Jenkins
work in progress
no esc issues at time of inspection
near completion
General Inspection11/10/201411/10/201411/10/2014 PASS
DetailsEvan Jenkins
WIP. No esc issues occuring at this time
General Inspection10/24/201410/24/201410/24/2014 PASS
DetailsEvan Jenkins
General Inspection10/9/201410/9/201410/9/2014 PASS
DetailsAndy J. Long
BLD finaled and no further construction activity. SIte is not yet landscaped and will need to see if bank that erosion control blanket will work during wet season. Drop inlets bag on Hill are still installed. Will continue to monitor.
General Inspection9/8/20149/8/20149/8/2014 PASS
DetailsEvan Jenkins
WIP
no esc issues at this time
General Inspection8/7/20148/7/20148/7/2014 PASS
DetailsEvan Jenkins
General Inspection7/7/20147/7/20147/7/2014 PASS
DetailsEvan Jenkins
work in progress
no esc issues at time of inspection
General Inspection6/5/20146/5/20146/5/2014 PASS
DetailsEvan Jenkins
No ESC Issues at time of inspection
General Inspection5/5/20145/5/20145/5/2014 PASS
DetailsEvan Jenkins
More Erosion Blanket was added on the hillside. no esc issues at time of inspection
BMP Violation4/2/20144/2/20144/2/2014PFAIL
DetailsEvan Jenkins
Correction Notice - hillside blowout to Hill Road and discharge to MS4. ACHD road crew required to do work for public safety to clear road way.
Install Erosion Blanket along eroding hillside, fix gully erosion, sweep road and Obtain Dewatering Plan from ACHD
General Inspection3/3/20143/3/20143/3/2014 PASS
DetailsEvan Jenkins
No ESC Issues at time of inspection
General Inspection1/30/20141/30/20141/30/2014 PASS
DetailsEvan Jenkins
Concrete Washout almost at half capacity at time of inspection. Getting close to perform maintenance (cleanout). No other ESC Issues at time of insepction
General Inspection12/30/201312/30/201312/30/2013 PART
DetailsEvan Jenkins
Construction sign needed Replaced. Gave RP a new sign and watched him fill it out. He stated he will post it today.
No Other ESC Issues at time of inspection
BMP Violation11/27/201311/27/201311/27/2013PPASS
DetailsAndy J. Long
Disturbed hillside where sewer and water lines were installed has been stabilized with geotextile mat and additional wattles. DI protection on adjacent stormwater structures is adequate. Corrective actions are approved. No new corrections at this time.
General Inspection11/14/201311/14/201311/14/2013 FAIL
DetailsAndy J. Long
Disturbed hillslope between house at 1350 and Hill Road (where new water line is) needs improved wattles/silt fence BMP until stabilization can occur.

Called RP Al Macmillan (homeowner RP) to notify of correction notice. ###-####
General Inspection10/14/201310/14/201310/14/2013 PASS
DetailsAndy J. Long
Permit is faded and weather damaged, but is in place. No track out. Two projects, same driveway. Other address is 1350 Hill Road. Next week will be trenching in water and sewer through hillside. No corrections at this time.
General Inspection9/12/20139/12/20139/13/2013 PASS
DetailsDaryl Spivey
General Inspection8/12/20138/12/20138/16/2013 PASS
DetailsTony Young
General Inspection7/12/20137/12/20137/12/2013 DONE
DetailsClint A Smith
General Inspection6/11/20136/11/20136/11/2013 PASS
DetailsClint A Smith
General Inspection5/10/20135/10/20135/10/2013 PASS
DetailsClint A Smith
General Inspection4/9/20134/9/20134/9/2013 PASS
DetailsClint A Smith
General Inspection11/30/201211/30/201211/30/2012 DONE
DetailsClint A Smith
PErmit finaled
DOC - Permit Finaled11/30/201211/30/201211/30/2012PPASS
DetailsClint A Smith
General Inspection10/26/201210/30/201210/30/2012APASS
DetailsClint A Smith
General Inspection10/26/201210/26/201210/26/2012 DONE
DetailsClint A Smith
meeting with the rp owner on 10/30/2012
General Inspection9/25/20129/25/20129/25/2012 PASS
DetailsClint A Smith
Site Preparation8/17/20128/22/20128/22/2012APART
DetailsClint A Smith
Discussed with the owner over the proper way to install the sediment controls (gator gaurds). Also explained to him once he goes into the vertical phase of his project, that he must install sediment controls at the top of slopes and supply a stabilized construction exit for tracking controls. Will periodically check up on the project.
Site Preparation8/17/20128/17/20128/17/2012 NR