Site Final | 7/25/2013 | 7/26/2013 | 7/25/2013 | A | PASS |
Kimberly M. Johnson
|
|
|
brandon Phone #: ###-####
|
DOC - Permit Finaled | 7/25/2013 | 7/25/2013 | 7/25/2013 | P | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 7/18/2013 | 7/18/2013 | 7/19/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/17/2013 | 6/17/2013 | 6/17/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/16/2013 | 5/16/2013 | 5/17/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/15/2013 | 4/15/2013 | 4/16/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/14/2013 | 3/14/2013 | 3/14/2013 | | PART |
Kimberly M. Johnson
|
|
|
Construction entrances good; Signage posted; BMP and grading around canal good; construction limits clearly shown on plan map; Updates to plan map current; Masons are using washout; Washout liner needs extended to catch dribbles and will need maintained prior to next pour; Area around mixer needs cleaned up and containment in place.
|
General Inspection | 2/11/2013 | 2/11/2013 | 2/11/2013 | | CANC |
Alan Hauser
|
|
|
|
General Inspection | 1/11/2013 | 1/11/2013 | 1/11/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/7/2012 | 12/11/2012 | 12/11/2012 | A | PART |
Clint A Smith
|
|
|
Discussed with the RP over the federal CGP and the requirements he must achieve to be and stay compliant with the CGP and the ESc permit.
|
General Inspection | 12/7/2012 | 12/7/2012 | 12/7/2012 | | DONE |
Clint A Smith
|
|
|
Moved to 12/11/2012 an 10 a.m.
|
Site Preparation | 11/6/2012 | 11/6/2012 | 11/7/2012 | P | PASS |
Jim Sly
|
|
|
Jeff phone
|
General Inspection | 11/1/2012 | 11/1/2012 | 11/1/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 9/21/2012 | 10/1/2012 | 10/6/2012 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 9/21/2012 | 9/21/2012 | 9/21/2012 | | NR |
Clint A Smith
|
|
|
Rescheduled for Oct. 1st.
|