Site Final | 11/29/2012 | 11/29/2012 | 11/29/2012 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 11/29/2012 | 11/29/2012 | 11/29/2012 | P | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 8/16/2012 | 8/16/2012 | 8/16/2012 | | PART |
Clint A Smith
|
|
|
Discussed with the RP over the additional requirements. They have just begun the project so she will be protecting the storm drain on the corner on the corner of Regan and 25th and will be posting the ESC sign along the 25th st. side of the project dur to all activities located at the back on the home.
|