Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC12-00842
StatusFinaled
Name CAMERON JAYO
Site Address 922 E WRIGHT ST
Project NameTRAILWIND SUBDIVISION
Customer Number 
ePlanReviewNo
Description
Develop site infrastructure for future development of subdivision. Permit includes general grading, pipe and utility installation, consturction of roadways and seepage beds.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/27/201511/27/201511/27/2015APASS
DetailsChad Schwendiman
General Inspection10/22/201510/22/201510/22/2015PPASS
DetailsAndy J. Long
WIP on SFHs by Jayo Co. in Trailwind Sub. Permit signs posted, streets and gutters are free of loose sediment or trackout. Perimeter wattles installed on vacant lots with potential for sediment runoff. Trash contained. Subdivision is approximately 75% complete. No corrections.
Aging Inspection10/5/201510/5/201510/5/2015 PASS
DetailsAndy J. Long
Aging Inspection8/3/20158/3/20158/3/2015 PASS
DetailsAndy J. Long
WIP on Trailwinds sub. BMPs installed. Permits posted on active SFH projects. No discharges, uncontained trash, or other issues.
Aging Inspection6/1/20156/1/20156/1/2015 PASS
DetailsEvan Jenkins
Aging Inspection3/30/20153/30/20153/30/2015 PASS
DetailsAndy J. Long
Trailwinds sub has 5 townhomes currently in progress. Trash and materials are contained, no wind blown litter or debris. Wright Street sidewalks and gutters have minimal dirt.

Subdivsion BMPs (inlet protection, perimeter wattles) are installed. After landscaping the access alley should be swept.
Tracking Control1/27/20151/27/20151/27/2015PFAIL
DetailsAndy J. Long
Private road through Trailwinds is full of loose dirt, sawdust, and other materials that requires cleaning and sweeping ASAP.

ACHD street sweeper did clean Wright while I was onsite.

Corrections:
1. Clean up all loose dirt on private drive and Wright.
2. Designate staging and work area to contain/consolidate sawdust and other
3. Check DI filter bags and maintain as necessary.

Notice of corrections issued verbally to developer/RP Cameron Jayo.
Aging Inspection1/5/20151/5/20151/5/2015 PART
DetailsAndy J. Long
3 townhomes in progress in Trailwinds sub with seperate permits. Excavator and foundation crew drove over perimeter wattles in certain areas and mud/dirt that is unfreezing in uncontained. No major trackout to streets, but some mud and dirt on sidewalks.

No perimeter protection on stockpile next to the townhome in progress.

DI protection in working condtion.

Corrections:

As weather allows, clean up mud and dirt that has left sites. Reinstall/repair wattles that have been damaged and protect or remove the stockpile.
Site Preparation11/4/201411/5/201411/4/2014ACANC
DetailsAndy J. Long
data entry error
Aging Inspection11/4/201411/4/201411/4/2014 PASS
DetailsAndy J. Long
Random Inspection9/4/20149/4/20149/4/2014APASS
DetailsAndy J. Long
Trailwinds sub has homesites in progress and perimeter wattles surrounding the open area which is also used for landscaping staging.

No corrections at this time.
Aging Inspection7/21/20147/21/20147/21/2014 PASS
DetailsEvan Jenkins
native vegetation beginning to grow on baren vacant lots. Currently no work taking place. A couple houses complete
BMP's in place
Aging Inspection5/19/20145/19/20145/19/2014 CANC
DetailsEvan Jenkins
Aging Inspection3/17/20143/17/20143/17/2014 PASS
DetailsAndy J. Long
Subdivision construction is complete, individual lots with seperate permits are in progress. Open area that was seeded is growing well. DI protection installed. No corrections required at this time.
General Inspection1/13/20141/13/20141/13/2014 PASS
DetailsEvan Jenkins
no violations at time of inspection
General Inspection11/11/201311/11/201311/12/2013 CANC
DetailsEvan Jenkins
Holiday
General Inspection9/9/20139/9/20139/10/2013 PASS
DetailsBob Reichert
no esc signs, no grass
General Inspection7/8/20137/8/20137/8/2013 PASS
DetailsKimberly M. Johnson
Complaint Inspection5/8/20135/8/20135/8/2013ADONE
DetailsClint A Smith
No dust seen at this time. No minimal dust surpressing controls sen on the site. Left a message for with the RP of the developement making him aware of the situation and that DEQ can be contacted if the problem conitues.
BMP Violation3/19/20133/20/20133/20/2013AFAIL
DetailsClint A Smith
Notice still posted at the job site. Hae not corrected any of the violations.
General Inspection3/19/20133/19/20133/19/2013 FAIL
DetailsClint A Smith
C/N posted. Message to RP;
Install sediment barries along disturbed soil where the grade slopes toward the hard surfaces and has the potental for turbid discharges entering into the storm drain system. Will re-inspect on 3/20/2013
General Inspection1/16/20131/16/20131/16/2013 PASS
DetailsClint A Smith
BMP Violation11/15/201211/16/201211/16/2012APASS
DetailsClint A Smith
General Inspection11/15/201211/15/201211/15/2012AFAIL
DetailsClint A Smith
Verbal to RP:
Provide protection to the storm drains within the two exsisting streets that have project has connected to. "Will follow up om 11/16/2012
General Inspection10/17/201210/18/201210/23/2012APASS
DetailsClint A Smith
General Inspection9/12/20129/12/20129/12/2012 FAIL
DetailsClint A Smith
Left a message with RP to apply dust control measures per the approved ESC plan.