Permit Information
Permit NumberESC12-00845
StatusFinaled
Name JAMES RYAN MCNICKLE
Site Address 1419 E WARM SPRINGS AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
***8-30-2012 THIS PERMIT IS MODIFIED TO REFLECT THE FOOTINGS AND FOUNDATION WORK FOR THE EXTENSIVE REMODEL AND ADDITION TO THE DWELLING UNITS. 8-30-2012 pep ****SPECIAL INVESTIGATION FEE ISSUED FOR BEGINNING WORK WITHOUT PERMIT. Permit is for Demo, canal piping and stabilization only. Does not cover building addition
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection3/27/20143/27/20143/27/2014 PASS
DetailsAndy J. Long
Finaled.
DOC - Permit Finaled3/27/20143/27/20143/27/2014PPASS
DetailsAndy J. Long
This phase of project is complete and landscape/stabilized. All permits finaled house is occupied. Next phase of project (1415 Warm Springs) is covered up ESC14-00097.
General Inspection3/12/20143/12/20143/12/2014 PASS
DetailsAndy J. Long
East end of house is finished and landscaped. Some work going on at westend. No trackout to Warm Springs. MS4 has DI bag.
General Inspection2/25/20142/25/20142/25/2014 PASS
DetailsAndy J. Long
Retaining wall being put in on west parcel. The east is landscaped. WIP. No corrections at this time.
General Inspection2/10/20142/10/20142/10/2014 PART
DetailsAndy J. Long
Need to sweep sidewalk in front of house. WIP

No trackout onto Warm Springs or at rear construction access, which no longer has vehicle access.
General Inspection1/24/20141/24/20141/24/2014 PASS
DetailsAndy J. Long
Some dirt from landscaping on sidewalk, instructed to workers to sweep up when done with day. No track out to street or gutter. Rear access to homesite off Villa is clean with no construction traffic, just parking for workers.

Approved.
General Inspection1/9/20141/9/20141/9/2014 PASS
DetailsAndy J. Long
Work on second portion of house in progress. Front and back have been mostly landscaped. No violations observed. Two ESC permits cover this project
General Inspection12/25/201312/25/201312/26/2013 CANC
DetailsEvan Jenkins
Holiday
General Inspection12/10/201312/10/201312/10/2013 PASS
DetailsAndy J. Long
General Inspection11/25/201311/25/201311/25/2013 PASS
DetailsAndy J. Long
General Inspection11/8/201311/8/201311/8/2013 PASS
DetailsAndy J. Long
Final landscaping in progress. No corrections at this time.
General Inspection10/24/201310/24/201310/24/2013 PASS
DetailsAndy J. Long
WIP. Front yard is has been laid with sod, some stockpiles remain, but no track out and DI bag on MS4 of Warm Springs. Rear construction entrance (for backyard) has been improved. No track out on Villa street.
General Inspection10/9/201310/9/201310/9/2013 PASS
DetailsAndy J. Long
Canal has been placed in culvert and is covered now. Construction on-going. No ESC violations at this time but will need to keep back entrance to lot clean. Landscaping is occuring in the front a long Warm Springs.
General Inspection9/24/20139/24/20139/24/2013 PASS
DetailsAndy J. Long
Drop inlet protection in good condition, no sediment track out. Permits posted and BMPs installed along canal. Approved
General Inspection9/9/20139/9/20139/9/2013 PASS
DetailsBill VanDegrift
General Inspection8/23/20138/23/20138/23/2013 PART
DetailsBill VanDegrift
inlet protection looks good, will cover stock pile and were sweeping trackout as I was there
General Inspection8/8/20138/8/20138/9/2013 CANC
DetailsKimberly M. Johnson
General Inspection7/24/20137/24/20137/24/2013 PART
DetailsKimberly M. Johnson
Washout is full. Stockpile not fully covered with tarp
General Inspection6/24/20136/24/20136/24/2013 CANC
DetailsKimberly M. Johnson
General Inspection6/7/20136/7/20136/7/2013 PASS
DetailsClint A Smith
General Inspection5/23/20135/23/20135/23/2013 PASS
DetailsClint A Smith
General Inspection5/8/20135/8/20135/8/2013 PASS
DetailsClint A Smith
General Inspection4/23/20134/23/20134/23/2013 CANC
DetailsClint A Smith
General Inspection4/5/20134/5/20134/7/2013 PASS
DetailsClint A Smith
BMP Violation3/19/20133/21/20133/20/2013PPASS
DetailsEric Strole
Kim spoke with RP and storm drain inlet is protected and stock pile and concrete wash out worked out with kim.
BMP Violation3/15/20133/19/20133/19/2013AFAIL
DetailsEric Strole
Left written correction and Kim Johnson to leave verbal with RP to maintain storm drain inlet (back in cove) maintain concrete washout pryer to next pour and stalilize stock pile. Have complete by 3-21-13 am or s stop work will be issued. will reinspect on 3-21-13 pm.
BMP Violation3/15/20133/15/20133/15/2013AFAIL
DetailsEric Strole
Left verbal and written correction to maintain concrete washout pryer to next pour, maintain storm drain inlets, stabilize stock pile and clean up all dirt and debris off all hard surfaces and gutter pans.Have complete by 3-18-13 pm. Will reinspect on 3-19-13 am
General Inspection3/5/20133/5/20133/5/2013 PASS
DetailsClint A Smith
General Inspection2/18/20132/18/20132/19/2013 CANC
DetailsKimberly M. Johnson
Holiday
General Inspection2/1/20132/1/20132/1/2013 PASS
DetailsClint A Smith
Random Inspection2/1/20132/1/20132/1/2013PPASS
DetailsJim Storey
General Inspection1/17/20131/17/20131/17/2013 PASS
DetailsClint A Smith
General Inspection1/2/20131/2/20131/2/2013 PASS
DetailsKimberly M. Johnson
General Inspection12/18/201212/18/201212/18/2012 PART
DetailsKimberly M. Johnson
washout pit needs cleaned out.
General Inspection11/30/201211/30/201211/30/2012 PASS
DetailsKimberly M. Johnson
Random Inspection11/15/201211/15/201211/15/2012PCANC
DetailsTom Arcoraci
General Inspection11/14/201211/14/201211/14/2012 PASS
DetailsKimberly M. Johnson
General Inspection10/26/201210/26/201210/26/2012 FAIL
DetailsKimberly M. Johnson
concrete washout not in contained pit and within 50' of canal. washout facility at max capacity. stockpile needs stabilized. LM for RP. Bob from Visser construction called back 10-29 AM to discuss and will get cleaned up.
General Inspection10/11/201210/11/201210/11/2012 PART
DetailsKimberly M. Johnson
Concrete washout close to max capacity. Washout on ground approx 25 feet from canal
Random Inspection9/26/20129/26/20129/26/2012APASS
DetailsKimberly M. Johnson
Culvert should be in and water scheduled to be turned on Thursday afternoon 9/27
Conference9/25/20129/25/20129/25/2012PDONE
DetailsKimberly M. Johnson
Met with RP on site to look at canal work (work permitted thru drainage canal owner with engineered drawings. Adjacent construction and addition over canal permitted thru City). Verbal Stop Work on grading work adjacent to canal until work can be performed in the dry as per plan. Note, canal was turned off this morning and only a slow tickle was present at time of conference due to inadequate pump capacity. Requested cofferdam at down gradient side of canal to be installed. Will re-inspect 9/26/12.
Partial Stop Work Order9/25/20129/25/20129/25/2012ADONE
DetailsKimberly M. Johnson
Stop Work on grading work adjacent to canal until work can be performed in the dry as per plan
General Inspection9/13/20129/13/20129/13/2012 PASS
DetailsKimberly M. Johnson
Site Preparation8/30/20128/29/20128/29/2012 PART
DetailsKimberly M. Johnson
Perimeter controls in place. Silt fence was not trenched in. Contractor removed silt fence and installed wattles. Upon demo of deck, it was discovered that the slopes to canal were not stabilized. Canal work will be performed in the dry and subsequently permanently stabilized. This work is tenatively scheduled for mid September. Construction entrance and concrete washout scheduled to go in 8/30/12. Discussed requirement to have washout a minimum of 50' from canal
Stop Work Order8/20/20128/20/20128/20/2012ADONE
DetailsKimberly M. Johnson
Working without permits