Aging Inspection | 12/30/2013 | 12/30/2013 | 12/30/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 12/30/2013 | 12/30/2013 | 12/30/2013 | P | PASS |
Andy J. Long
|
|
|
Project is complete. Parking lot and vegetation are installed. BLD permit is finaled.
|
General Inspection | 10/28/2013 | 10/28/2013 | 10/28/2013 | | PASS |
Evan Jenkins
|
|
|
Construction appears to be complete. No ESC Issues
|
BMP Violation | 8/27/2013 | 8/28/2013 | 8/28/2013 | A | PASS |
Bill VanDegrift
|
|
|
protection in place and site is being cleaned up
|
General Inspection | 8/27/2013 | 8/27/2013 | 8/27/2013 | | FAIL |
Bill VanDegrift
|
|
|
1)install inlet protection 2)provide container for the trash 3)clean up cement debris in front left correction notice and went over job with rp
|
General Inspection | 6/24/2013 | 6/24/2013 | 6/24/2013 | | NR |
Kimberly M. Johnson
|
|
|
Work scheduled to start in July
|
General Inspection | 4/24/2013 | 4/24/2013 | 6/24/2013 | A | NR |
Tom Arcoraci
|
|
|
|
Site Preparation | 2/22/2013 | 2/22/2013 | 6/24/2013 | | NR |
Tom Arcoraci
|
|
|
|