DOC - Permit Finaled | 6/11/2013 | 6/11/2013 | 6/11/2013 | P | CANC |
Clint A Smith
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
General Inspection | 6/11/2013 | 6/11/2013 | 6/11/2013 | | PASS |
Clint A Smith
|
|
|
Permit finaled
|
BMP Violation | 5/7/2013 | 5/10/2013 | 5/10/2013 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/7/2013 | 5/7/2013 | 5/7/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP; Maintain perimeter sediment control within the back section of lot where the sediment build up has exceeded over 50%. WIll follow up on 5/10/2013
|
General Inspection | 4/5/2013 | 4/5/2013 | 4/8/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/5/2013 | 3/5/2013 | 3/5/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 2/1/2013 | 2/1/2013 | 2/1/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/1/2013 | 1/1/2013 | 1/2/2013 | | PASS |
Kimberly M. Johnson
|
|
|
ground covered with approx 1" snow
|
General Inspection | 11/30/2012 | 11/30/2012 | 11/30/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 10/30/2012 | 10/30/2012 | 10/30/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 9/28/2012 | 9/28/2012 | 9/28/2012 | | PASS |
Clint A Smith
|
|
|
|