General Inspection | 6/12/2014 | 6/12/2014 | 6/12/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 6/12/2014 | 6/12/2014 | 6/12/2014 | P | PASS |
Andy J. Long
|
|
|
Construction complete. No violations. ESC conditions satisfied. Fiber wattle can remain installed along driveway until homeowner is ready to remove it or it biodegrades.
|
General Inspection | 5/12/2014 | 5/12/2014 | 5/12/2014 | | PASS |
Andy J. Long
|
|
|
Homeowner RP. Work ongoing. No corrections required at this time.
|
General Inspection | 4/10/2014 | 4/10/2014 | 4/10/2014 | | PASS |
Andy J. Long
|
|
|
Homeowner project. Still in progress. No corrections.
|
General Inspection | 3/10/2014 | 3/10/2014 | 3/10/2014 | | PASS |
Andy J. Long
|
|
|
Addition is surrounded by the yard. Driveway is not yet paved, but is below level of curb so no sediment leaving site. WIP.
|
General Inspection | 2/6/2014 | 2/6/2014 | 2/6/2014 | | PASS |
Evan Jenkins
|
|
|
Site Covered in Snow. No ESC Issues at time of inspection
|
General Inspection | 1/6/2014 | 1/6/2014 | 1/6/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/5/2013 | 12/5/2013 | 12/5/2013 | | PASS |
Evan Jenkins
|
|
|
Erosion Blanket covering back yard hillside
|
General Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/3/2013 | 10/3/2013 | 10/3/2013 | | PASS |
Andy J. Long
|
|
|
Permit posted. BMPs in place. No trackout or other violations. Construction is on-going.
|
General Inspection | 9/2/2013 | 9/2/2013 | 9/10/2013 | | PASS |
Rock A. Hudson
|
|
|
|
General Inspection | 8/1/2013 | 8/1/2013 | 8/1/2013 | | PASS |
Rock A. Hudson
|
|
|
|
General Inspection | 7/1/2013 | 7/1/2013 | 7/1/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/31/2013 | 5/31/2013 | 5/31/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/30/2013 | 4/30/2013 | 4/30/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/28/2013 | 3/28/2013 | 3/29/2013 | | PASS |
Kimberly M. Johnson
|
|
|
RP to change to Homeowner. Larry was with GC who is no longer working on property. Landscaping scheduled to start next week. Homeowner will be be pulling wattles out in front to put in retaining wall. Discussed keeping road clean.
|
General Inspection | 2/25/2013 | 2/25/2013 | 2/25/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 1/25/2013 | 1/25/2013 | 1/28/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/25/2012 | 12/25/2012 | 12/26/2012 | | CANC |
Clint A Smith
|
|
|
Holiday
|
General Inspection | 11/22/2012 | 11/22/2012 | 11/23/2012 | | CANC |
Kimberly M. Johnson
|
|
|
Holiday
|
General Inspection | 10/22/2012 | 10/22/2012 | 10/22/2012 | | PART |
Clint A Smith
|
|
|
Verbal to RP: To prevent erosion off of the property, you must install sediment barriers at a minimum in the front section of the access and try to initiate perminate stabilization measure as soon as practible.
|
General Inspection | 9/19/2012 | 9/19/2012 | 9/19/2012 | A | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 9/13/2012 | 9/14/2012 | 9/17/2012 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: Clean up the access on a daily basis.
|
Site Preparation | 9/13/2012 | 9/13/2012 | 9/13/2012 | A | PEND |
Dixie Fellows
|
|
|
sent to clint for fri am
|