Aging Inspection | 7/3/2013 | 7/3/2013 | 7/3/2013 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 7/3/2013 | 7/3/2013 | 7/3/2013 | P | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 5/3/2013 | 5/3/2013 | 5/3/2013 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 3/1/2013 | 3/1/2013 | 3/1/2013 | P | PART |
Clint A Smith
|
|
|
Removed the stop work order and RP will have the hard surfaces cleanedup by the end of the work day today.
|
Stop Work Order | 2/28/2013 | 2/28/2013 | 2/28/2013 | A | FAIL |
Clint A Smith
|
|
|
STOP WORK ORDER ISSUED Posted correction notice. Clean up all hard surfaces of all sediment and debris. Clean up all concrete residual in the gutter pan intothe storm drain inlet. Re-establish concrete washout. No concrete can be placedon the subdivision until all issues are corrected and stop work oerder is lifted. Verbal notice given to RP.
|
BMP Violation | 2/13/2013 | 2/13/2013 | 2/14/2013 | A | FAIL |
Clint A Smith
|
|
|
Verbal Correction given to RP; Clan up all hard surface of all sediment and debris. Provide sediment barriers along area where there is a potential for runoff.
|
Random Inspection | 12/26/2012 | 12/26/2012 | 12/26/2012 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 12/21/2012 | 12/21/2012 | 12/21/2012 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 10/26/2012 | 10/26/2012 | 10/26/2012 | | NR |
Clint A Smith
|
|
|
|