General Inspection | 4/30/2013 | 4/30/2013 | 4/30/2013 | | DONE |
Clint A Smith
|
|
|
Permit finaled
|
DOC - Permit Finaled | 4/30/2013 | 4/30/2013 | 4/30/2013 | P | PASS |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 4/30/2013 | 4/30/2013 | 4/30/2013 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/28/2013 | 3/28/2013 | 3/28/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/25/2013 | 2/25/2013 | 2/26/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/24/2013 | 1/24/2013 | 1/28/2013 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 12/20/2012 | 12/24/2012 | 12/24/2012 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 12/18/2012 | 12/20/2012 | 12/20/2012 | A | NR |
Clint A Smith
|
|
|
Discussed with the RP that all correction will be complete on 12/21/2012 by the end of the work day. Due to ground freeze.
|
General Inspection | 12/18/2012 | 12/18/2012 | 12/18/2012 | | FAIL |
Clint A Smith
|
|
|
Message to RP; Maintain thesediment barrie located at the lower section of the lot next to the drainage swale. Will re-inspect on 12/20/2012
|
Site Preparation | 11/15/2012 | 11/15/2012 | 11/15/2012 | A | PART |
Mike Jordan
|
|
|
Contractor working on corrections. Noted to provide washout.
|
Conference | 11/8/2012 | 11/13/2012 | 11/13/2012 | P | DONE |
Kimberly M. Johnson
|
|
|
Discussed need to protect the permanent stormwater BMPs from construction activities with temporary BMPs.
|
Random Inspection | 11/8/2012 | 11/8/2012 | 11/8/2012 | P | FAIL |
Kimberly M. Johnson
|
|
|
Perimeter controls need installed on backside. Excavated topsoil stockpile extends outside limits of disturbance onto neighboring lot. LM for RP. Will reinspect 11/13
|
General Inspection | 10/17/2012 | 10/17/2012 | 10/17/2012 | | PASS |
Clint A Smith
|
|
|
|