General Inspection | 5/7/2013 | 5/7/2013 | 5/7/2013 | | DONE |
Clint A Smith
|
|
|
Permit finaled
|
DOC - Permit Finaled | 5/7/2013 | 5/7/2013 | 5/7/2013 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/20/2013 | 3/20/2013 | 3/20/2013 | | PASS |
Clint A Smith
|
|
|
Inspection completed on 3/19/2013
|
General Inspection | 1/29/2013 | 2/1/2013 | 2/1/2013 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/28/2013 | 1/28/2013 | 1/29/2013 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice; (given to the IRP Travis) Amend the ESC permit application to include the additional area of disturbance. Pay the additional fees if needed. Will re-inspect on 2/1/2013 PM
|
Conference | 1/15/2013 | 1/16/2013 | 1/17/2013 | A | CANC |
Clint A Smith
|
|
|
Waiting to adjust the the conctruction to another location until needed.
|
Conference | 1/15/2013 | 1/15/2013 | 1/15/2013 | A | PART |
Clint A Smith
|
|
|
Has not figured out the future area of disturbance on the construction exit is relocated. Work has begun this week though. Will re-inspect for the area of disturbance tomorrow.
|
Site Preparation | 1/11/2013 | 1/11/2013 | 1/11/2013 | | NR |
Clint A Smith
|
|
|
Discussed with the RP over the plan alterations. He must calculate the sqaure footage of the access, construction road and construction parking alterations. Explained to him that due to the additional area of disturbance; additional fees may be required.
|