Aging Inspection | 2/24/2014 | 2/24/2014 | 2/24/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 2/24/2014 | 2/24/2014 | 2/24/2014 | P | PASS |
Andy J. Long
|
|
|
LNG fueling station complete. ESC conditions satisfied. No further inspections necessary. BLD permits finaled except for rough grading.
|
Aging Inspection | 12/23/2013 | 12/23/2013 | 12/27/2013 | | CANC |
Eric Strole
|
|
|
|
General Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 | | PASS |
Andy J. Long
|
|
|
Site landscaped and stabilized. No track out or other violations observed. Some minor activity is on going and wattles are still installed. Approved.
|
General Inspection | 8/19/2013 | 8/19/2013 | 8/21/2013 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 6/18/2013 | 6/18/2013 | 6/20/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/15/2013 | 4/15/2013 | 4/15/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/12/2013 | 2/12/2013 | 2/12/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/11/2012 | 12/11/2012 | 12/11/2012 | | CANC |
Clint A Smith
|
|
|
|
Site Preparation | 10/8/2012 | 10/11/2012 | 10/11/2012 | | NR |
Kimberly M. Johnson
|
|
|
Construction expected to begin this week or next. RP will call ESC dept to notify. No activity 10/11/12
|