General Inspection | 11/21/2013 | 11/21/2013 | 11/21/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 11/21/2013 | 11/21/2013 | 11/21/2013 | P | PASS |
Andy J. Long
|
|
|
Construction is finished. House is landscaped. Backyard has been hydroseeded and grass is taking root - 1 wattle remains to aide stabilization. BLD permit has been finaled. No further ESC inspections
|
General Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 | | PART |
Evan Jenkins
|
|
|
Yard has been Sodded and Hydro-seeded. Disturbed area from equiptment on south side of site needs to be re-vegetated also. Bare highly erosive sediment must be stabilized prior to ESC Final
|
General Inspection | 8/20/2013 | 8/20/2013 | 8/27/2013 | | PEND |
Bob Archibald
|
|
|
pending bld final
|
General Inspection | 7/19/2013 | 7/19/2013 | 7/22/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Awaiting final stabilization
|
General Inspection | 6/18/2013 | 6/18/2013 | 6/18/2013 | | CANC |
Kimberly M. Johnson
|
|
|
|
General Inspection | 5/17/2013 | 5/17/2013 | 5/17/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/16/2013 | 4/16/2013 | 4/17/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/15/2013 | 3/15/2013 | 3/19/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/12/2013 | 2/12/2013 | 2/12/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/9/2013 | 1/9/2013 | 1/9/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/7/2012 | 12/7/2012 | 12/7/2012 | P | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 11/9/2012 | 11/9/2012 | 11/9/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/20/2013 | 9/20/2013 | | | |
Dave Hannah
|
|
|
|