General Inspection | 1/21/2014 | 1/21/2014 | 1/21/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 1/21/2014 | 1/21/2014 | 1/21/2014 | P | PASS |
Andy J. Long
|
|
|
House complete and landscaped. BLD permit has been finaled. Multifamily house is now for sale. ESC conditions satisfied.
|
General Inspection | 12/6/2013 | 12/6/2013 | 12/6/2013 | | PASS |
Andy J. Long
|
|
|
Construction is complete. BLD permit is open. Some minor sweep up in culdesac should be conducted prior to Final. Open space has been seeded/stabilized.
|
General Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 | | PASS |
Andy J. Long
|
|
|
Permit posted. No ESC violations; site is not yet fully stabilized and interior construction is in progress.
|
General Inspection | 9/3/2013 | 9/3/2013 | 9/10/2013 | | PART |
Eric Strole
|
|
|
Left message with RP via voice mail to post esc signs. Rest of site looks good and will check next time in area.
|
General Inspection | 7/19/2013 | 7/19/2013 | 7/23/2013 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 6/3/2013 | 6/3/2013 | 6/4/2013 | | NR |
Eric Strole
|
|
|
no activity at this time
|