General Inspection | 7/26/2013 | 7/26/2013 | 7/29/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Permit Finaled
|
DOC - Permit Finaled | 7/29/2013 | 7/29/2013 | 7/29/2013 | P | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 6/25/2013 | 6/25/2013 | 6/25/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 5/24/2013 | 5/24/2013 | 5/24/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/23/2013 | 4/23/2013 | 4/23/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/20/2013 | 3/20/2013 | 3/20/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all concrete residual at the washout and construct a proper concrete washout. Post ESC sign where visable.
|
General Inspection | 2/14/2013 | 2/14/2013 | 2/14/2013 | P | PASS |
Dixie Fellows
|
|
|
jayo const....site maintained
|
General Inspection | 1/29/2013 | 1/29/2013 | 1/30/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 12/27/2012 | 12/27/2012 | 12/27/2012 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 12/25/2012 | 12/25/2012 | 12/26/2012 | | CANC |
Clint A Smith
|
|
|
Holiday
|