Aging Inspection | 6/20/2013 | 6/20/2013 | 6/20/2013 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 6/20/2013 | 6/20/2013 | 6/20/2013 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/15/2013 | 2/15/2013 | 2/15/2013 | P | PART |
Mike Jordan
|
|
|
Overflowing trash bins have been emptied. crews were on site picking up construction debries while on site. RP noted that he has a street sweeper scheduled for late afternoon.
|
Tracking Control | 12/18/2012 | 12/18/2012 | 12/18/2012 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 12/7/2012 | 12/7/2012 | 12/7/2012 | P | PART |
Mike Jordan
|
|
|
ESC permit sign posted, Needs to provide compliant washout. RP notified.
|
Site Preparation | 11/30/2012 | 12/3/2012 | 12/3/2012 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 11/30/2012 | 11/30/2012 | 11/30/2012 | | NR |
Clint A Smith
|
|
|
Moved to 12/3/2012
|