Site Final | 4/18/2013 | 4/18/2013 | 4/18/2013 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 4/18/2013 | 4/18/2013 | 4/18/2013 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 2/15/2013 | 2/15/2013 | 2/15/2013 | P | PART |
Mike Jordan
|
|
|
Overflowing trash bins have been emptied. crews were on site picking up construction debries while on site. RP noted that he has a street sweeper scheduled for late afternoon.
|
General Inspection | 2/7/2013 | 2/7/2013 | 2/7/2013 | P | PART |
Mike Jordan
|
|
|
A written correction notice was issued as well as a verbal correction notice to RP to sweep all hardsurfaces of silts and to hace sub contractors use construction enterances so as to limit trackout. Noted sweeping crews on site prior to leaving.
|
Tracking Control | 12/7/2012 | 12/7/2012 | 12/7/2012 | P | PART |
Mike Jordan
|
|
|
Underground utility placement in progress. Noted to contractor and RP to sweep hardsurfaces as needed and at end of day to keep trackout at min.
|
Random Inspection | 12/6/2012 | 12/6/2012 | 12/6/2012 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 12/5/2012 | 12/5/2012 | 12/5/2012 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 11/30/2012 | 12/3/2012 | 12/3/2012 | A | PART |
Clint A Smith
|
|
|
Need to post ESC sign
|
Site Preparation | 11/30/2012 | 11/30/2012 | 11/30/2012 | | NR |
Clint A Smith
|
|
|
Moved to 12/3/2012
|