Site Final | 4/12/2013 | 4/12/2013 | 4/12/2013 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 4/12/2013 | 4/12/2013 | 4/12/2013 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 2/7/2013 | 2/7/2013 | 2/7/2013 | P | PART |
Mike Jordan
|
|
|
A written correction notice was issued as well as a verbal correction notice to RP to sweep all hardsurfaces of silts and to hace sub contractors use construction enterances so as to limit trackout. Noted sweeping crews on site prior to leaving.
|
BMP Violation | 12/7/2012 | 12/7/2012 | 12/7/2012 | P | PART |
Mike Jordan
|
|
|
Noted to RP to provide additional washout or clean exisiting washouts, they have reached o exceeded the 50% capacity.
|
Site Preparation | 12/6/2012 | 12/6/2012 | 12/6/2012 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 11/30/2012 | 12/3/2012 | 12/3/2012 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 11/30/2012 | 11/30/2012 | 11/30/2012 | | NR |
Clint A Smith
|
|
|
Moved to 12/3/2012
|