Site Final | 10/25/2013 | 10/28/2013 | 10/28/2013 | A | PASS |
Jim Sly
|
|
|
Ryan
|
DOC - Permit Finaled | 10/28/2013 | 10/28/2013 | 10/28/2013 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | CANC |
Jim Sly
|
|
|
|
General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 | | PASS |
Andy J. Long
|
|
|
Permit posted on job sign. No track out or other ESC violations. On-site drop inlet protected with filter bags. Discussed removal of BMPs when finished with RP Ryan Smith who was on-site. Plan to open on the Oct. 28th, but have other permits open.
|
General Inspection | 8/27/2013 | 8/27/2013 | 8/30/2013 | | CANC |
Jim Johnson
|
|
|
|
General Inspection | 7/9/2013 | 7/9/2013 | 7/10/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Entrance along Franklin temporarily being used for only incoming traffic. 2" rock will be replaced to use as exit. Discussed with RP the need to replace the permit in the SWPPP with the 2012 CGP.
|
Site Preparation | 5/24/2013 | 5/24/2013 | 5/24/2013 | | NR |
Clint A Smith
|
|
|
|