General Inspection | 8/20/2013 | 8/20/2013 | 8/22/2013 | | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | 8/22/2013 | 8/22/2013 | 8/22/2013 | P | PASS |
Eric Strole
|
|
|
|
General Inspection | 6/19/2013 | 6/19/2013 | 6/19/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/16/2013 | 4/16/2013 | 4/16/2013 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 2/13/2013 | 2/13/2013 | 2/13/2013 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 2/8/2013 | 2/8/2013 | 2/8/2013 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 2/4/2013 | 2/5/2013 | 2/5/2013 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: block off access from the truck stop onto the project area.
|
Site Preparation | 2/4/2013 | 2/4/2013 | 2/4/2013 | | NR |
Bob Reichert
|
|
|
saw builder, will have esc card up to day, excavator will provide erosion controls
|