Site Final | 8/13/2013 | 8/13/2013 | 8/13/2013 | A | PASS |
Dixie Fellows
|
|
|
landscape is complete
|
General Inspection | 8/13/2013 | 8/13/2013 | 8/13/2013 | | PEND |
Dixie Fellows
|
|
|
will check on job
|
General Inspection | 7/10/2013 | 7/11/2013 | 7/11/2013 | P | PASS |
Rock A. Hudson
|
|
|
dug trench by sidewalk. Contractor to adjust sprinkler to prevent future issues
|
General Inspection | 7/9/2013 | 7/11/2013 | 7/10/2013 | P | CANC |
Rock A. Hudson
|
|
|
hill right of drive
|
General Inspection | 7/8/2013 | 7/10/2013 | 7/9/2013 | A | FAIL |
Rock A. Hudson
|
|
|
hill right of drive Correction not complete. Granted extra time do to RP leaving state. Will reinspect 7/11/13
|
General Inspection | 7/8/2013 | 7/8/2013 | 7/8/2013 | | FAIL |
Rock A. Hudson
|
|
|
Ryan no longer contact, Bob Hunter w/ Visser bldg company RP. Sprinklers washing sediment off hill side and into rain gutter. Verbal by phone will reinspect 7-10-12
|
Site Preparation | 6/3/2013 | 6/7/2013 | 6/7/2013 | A | PASS |
Clint A Smith
|
|
|
General Inspection
|
General Inspection | 6/3/2013 | 6/3/2013 | 6/3/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP; Maintain perimeter controls. Will re-inspect on 6/7/13
|
General Inspection | 5/2/2013 | 5/2/2013 | 5/2/2013 | | CANC |
Kimberly M. Johnson
|
|
|
|
Random Inspection | 4/1/2013 | 4/1/2013 | 4/1/2013 | P | FAIL |
Clint A Smith
|
|
|
Verbal to GC and RP; Maintain the siltfence perimeter control to where they will be working correctly.
|
General Inspection | 3/12/2013 | 3/12/2013 | 3/13/2013 | | PASS |
Dixie Fellows
|
|
|
perimeters all protected..garbage picked up
|
General Inspection | 2/6/2013 | 2/6/2013 | 2/8/2013 | | PASS |
Dixie Fellows
|
|
|
site is being maintained
|
Site Preparation | 1/2/2013 | 1/3/2013 | 1/3/2013 | A | PASS |
Tony Young
|
|
|
|
Site Preparation | 12/21/2012 | 12/21/2012 | 12/21/2012 | | PASS |
Clint A Smith
|
|
|
|