General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 | | PASS |
Andy J. Long
|
|
|
Emerald Station commercial sub rough grading and infrastructure installation is complete. The area is now the site of new St. Al's joint prevention center which is in progress under ESC14-00469.
ESC permit conditions satisfied.
|
DOC - Permit Finaled | 9/15/2014 | 9/15/2014 | 9/15/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/14/2014 | 7/14/2014 | 7/14/2014 | | PASS |
Andy J. Long
|
|
|
Work complete, no violations.
|
General Inspection | 5/12/2014 | 5/12/2014 | 5/12/2014 | | PASS |
Evan Jenkins
|
|
|
No ESC issues at time of inspection
|
General Inspection | 3/12/2014 | 3/12/2014 | 3/12/2014 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 1/10/2014 | 1/10/2014 | 1/10/2014 | P | PASS |
Evan Jenkins
|
|
|
Randy Phone #: ###-#### Construction sign and SWPPP are posted on Denton St. Construction entrance already in place. Irrigation ditch doesn't need protected due to it going to be piped. No Issues at time of inspection
|
General Inspection | 12/2/2013 | 12/2/2013 | 12/2/2013 | | PART |
Andy J. Long
|
|
|
No activity yet. No BMPs installed at this time. Will need site preparation inspection prior to earth work. Permt was issued 11/25/2013. Plan approved Dec-2012.
|