Permit Information
Permit NumberESC13-00013
StatusFinaled
Name ROBERT SILVA
Site Address 4416 N BURNSIDE PL
Project Name4416 Burnside
Customer Number 
ePlanReviewNo
Description
Foothill single family home. 2:1 slopes. Groundwater at 8.5 feet. Back retaining wall 9 ft. Storm drain inlets drain to crane creek
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled12/17/201312/17/201312/17/2013PPASS
DetailsAndy J. Long
Finaled. See activity notes.
General Inspection12/17/201312/17/201312/17/2013 PASS
DetailsAndy J. Long
House complete. Front slopes have been landscaped/stabilized, and retaining walls. Backyard has been hydroseeded and hillside stabilized. No materials or BMPs left on site. No further ESC inspections necessary.
General Inspection12/2/201312/2/201312/2/2013 PASS
DetailsEvan Jenkins
Front has been Sodded
Back yard has been Hydroseeded
Back yard must reach 70% Re-established prior to sign off (Steep back yard)
BMP Violation11/14/201311/15/201311/15/2013APASS
DetailsAndy J. Long
RP called saying corrections will be complete by Friday afternoon.

Reinspection Friday @ 1:20. Gutter has been swept and shoveled.
Site Preparation11/14/201311/15/201311/14/2013ACANC
DetailsAndy J. Long
wrong inspection type
General Inspection11/14/201311/14/201311/14/2013 PART
DetailsAndy J. Long
Project near completion. ESC maintenance issues at site.

Corrections:
1. Sweep culdesac
2. Sweep/shovel dirt in gutter on Burnside down to Harcourt.

RP Robert Silva notified of corrections
General Inspection10/30/201310/30/201310/30/2013 PASS
DetailsAndy J. Long
WIP. No correctins at this time.
General Inspection10/15/201310/15/201310/15/2013 PASS
DetailsAndy J. Long
Permit posted. No ESC violations at time of inspection. Approved. WIP
BMP Violation9/30/20139/30/201310/1/2013PPART
DetailsTony Young
Correction Notice Issued:
Repair/Maintain Silt Fence
Remove Porta-Pot from Right-of-Way
Sweep Curb
BMP Violation9/20/20139/23/20139/30/2013PPART
DetailsTony Young
Correction Notice Issued:
Repair/Maintain Silt Fence
Remove Porta-Pot from Right-of-Way
Sweep Curb
BMP Violation9/20/20139/20/20139/20/2013AFAIL
DetailsTom Arcoraci
Correction Notice Issued
General Inspection9/9/20139/9/20139/10/2013 PART
DetailsTony Young
Tracking Control8/21/20138/23/20138/23/2013APART
DetailsBill VanDegrift
silt fence is up and lower inlets are clean
General Inspection8/21/20138/21/20138/21/2013 FAIL
DetailsBill VanDegrift
silt fence needs to be maintained, inlet protection at the base of the hill needs to be replaced or cleaned left message with RP
BMP Violation8/5/20138/6/20138/6/2013APART
DetailsKimberly M. Johnson
BMP Violation8/5/20138/5/20138/5/2013PFAIL
DetailsKimberly M. Johnson
Inspection requested to lift SWO. Inspection failed
BMP Violation7/31/20138/1/20138/1/2013PFAIL
DetailsKimberly M. Johnson
SWO issued: repair silt fence; sweep side walk and gutter. Chance of T-storms tonight
Stop Work Order8/1/20138/1/20138/1/2013PDONE
DetailsKimberly M. Johnson
BMP Violation7/26/20137/31/20137/31/2013AFAIL
DetailsKimberly M. Johnson
Verbal to RP: Silt fence not installed properly and sediment on side walk and street need cleaned up
General Inspection7/26/20137/26/20137/26/2013 FAIL
DetailsKimberly M. Johnson
Written Correction notice issued: Repair perimeter control along front of lot and containerize or haul out trash.
General Inspection7/10/20137/10/20137/10/2013 PASS
DetailsClint A Smith
BMP Violation6/24/20136/25/20136/25/2013ADONE
DetailsClint A Smith
completed byKMJ
BMP Violation6/19/20136/21/20136/24/2013APART
DetailsKimberly M. Johnson
Repair silt fence along entrance. Repair work between toe of slope and silt fence along front property line is only a temporary fix to relieve the pressure. The verticle walls will slough back onto the silt fence.
General Inspection6/19/20136/19/20136/19/2013 FAIL
DetailsClint A Smith
Verbal to RP;
MAintain silt fence by removing the excess sediment load to releive the pressure so it does not collaps. Will re-inspect 6/21/2013
BMP Violation5/30/20136/3/20136/3/2013APASS
DetailsClint A Smith
General Inspection5/30/20135/30/20135/30/2013 FAIL
DetailsClint A Smith
Verbal to RP:
Clean up sediment and debris off of the hard surface. Install the second layer of silt fence per the manufactures specifications. Will re-inspect on 6/3/2013
General Inspection5/15/20135/15/20135/15/2013 PART
DetailsKimberly M. Johnson
Verbal to RP on 5/15: fix silt fence in front and expand washout. Dirt pile in front is a big liability. Regrade and/or backfill as soon as possible.
BMP Violation4/26/20134/29/20134/29/2013APASS
DetailsKimberly M. Johnson
RP requested inspection for Monday AM. Passed on contingency that storm drain BMPs would be cleaned out (not just the silt around it) and the silt fence would buried at least 6 inches and backfilled around entrance. Storm drains cleaned by the time I left. SWO lifted.
BMP Violation4/25/20134/26/20134/26/2013AFAIL
DetailsKimberly M. Johnson
RP requested inspection for 10:00. Inspection failed; still needs to install silt fence as discussed and clean the storm drains. Soil stockpile has been track walked. Discussed with excavator always track walking between cuts after haul out is complete.
BMP Violation4/19/20134/19/20134/19/2013PFAIL
DetailsKimberly M. Johnson
stop work order issued
Stop Work Order4/19/20134/19/20134/19/2013AFAIL
DetailsKimberly M. Johnson
Only work pertaining to correcting violations may occur. Per RP, drain rock stockpile scheduled to be moved Sat 4/20 and will haul out 200-400 CY of soi on Mon 4/22l. Will need to install ESC measures and stabilized exit prior to lifting SWO
Random Inspection4/17/20134/17/20134/17/2013PFAIL
DetailsKimberly M. Johnson
LM for RP: Staging retaining wall blocks and stockpile of drain rock in the ROW; stabilized construction entrance not yet installed; Silt fence not adequately trenched and is not installed along entire downslope perimeter. Due to foothill location and excavated loose soil on site (not track walked, compacted, stabilized, ect) this has a very high erosion risk and is considered enivironmentally sensitive not only because of topography but also because of drainage to Crane Creek
BMP Violation4/8/20134/10/20134/10/2013PPART
DetailsKimberly M. Johnson
In process of cleaning storm drains and building entrance during inspection.
BMP Violation4/3/20134/5/20134/8/2013PFAIL
DetailsKimberly M. Johnson
Stabilized entrance/road not in yet; still in process of hauling out material. No activity at time of inspection. Responsible Person was updated on permit. Written Correction Notice Issued: Remove accumulated sediment in and around storm drains. Repair Silt fence and patch gap in silt fence at front of property.
BMP Violation4/2/20134/3/20134/3/2013PPART
DetailsKimberly M. Johnson
Silt fence buried (not trenched). DI BMPs installed. In process of hauling out fill; haul out expected to be complete for first cut tomorrow. Because of steep slopes, the large of amount of soil and forecasted rain, I will reinspect 4/5 to check status
BMP Violation4/1/20134/2/20134/2/2013AFAIL
DetailsKimberly M. Johnson
Verbal to RP: silt fence in but not trenched in yet. Still need DI BMPs and sign corrected. RP said they will begin hauling out material today and will put in stabilized construction entrance/access road this week. Notified RP of rain in forecast 4/4-4/6. Will re-inspect 4/3.
Site Preparation4/1/20134/1/20134/1/2013AFAIL
DetailsKimberly M. Johnson
Work started. No BMPs in place and contact on ESC sign is not RP listed on permit. written correction notice issued.
Site Preparation3/26/20133/27/20133/27/2013PNR
DetailsKimberly M. Johnson
lot staked and ESC sign up; no earth disturbining activity or perimeter controls in yet.