Site Final | 6/12/2013 | 6/12/2013 | 6/12/2013 | P | PASS |
Jim Sly
|
|
|
Micah
|
DOC - Permit Finaled | 6/12/2013 | 6/12/2013 | 6/12/2013 | P | PASS |
Jim Sly
|
|
|
|
BMP Violation | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | PART |
Clint A Smith
|
|
|
Clean up on daily basis is required.
|
BMP Violation | 3/5/2013 | 3/6/2013 | 3/6/2013 | A | FAIL |
Clint A Smith
|
|
|
RP is working on other lots. But has not completed the installation of the gator gaurd. Will re-inspect tomorrow for compliance.
|
General Inspection | 3/5/2013 | 3/5/2013 | 3/5/2013 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP; Clean up all trash debris off of the lot. Install sediment controls per manufactures specs. Clean up all concrete/stucco/mortar residual off o the lot. Will re-inspect on 3/6/2013.
|
BMP Violation | 2/15/2013 | 2/19/2013 | 2/20/2013 | A | PASS |
Clint A Smith
|
|
|
Notice to RP; Provide sediment barriers to prevent runoff from ths stockpiles. Will re-inspect on 2/19/2013
|
Site Preparation | 2/14/2013 | 2/15/2013 | 2/15/2013 | A | PASS |
Jim Sly
|
|
|
Micah phone
|
BMP Violation | 2/15/2013 | 2/15/2013 | 2/15/2013 | A | FAIL |
Clint A Smith
|
|
|
Notice to RP; Provide sediment barriers to prevent runoff from ths stockpiles. Will re-inspect on 2/19/2013
|