General Inspection | 9/30/2013 | 9/30/2013 | 9/30/2013 | | PASS |
Andy J. Long
|
|
|
Finaled. See activity notes.
|
DOC - Permit Finaled | 9/30/2013 | 9/30/2013 | 9/30/2013 | P | PASS |
Andy J. Long
|
|
|
All permits finaled. Work is finished. Site is stabilized with vegetation. No further ESC inspections required.
|
General Inspection | 8/13/2013 | 8/13/2013 | 8/13/2013 | | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 6/26/2013 | 6/26/2013 | 6/27/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP; Reistall the sediment control along the north east perimeter of the property per industry standards. Will follow up for complicance on 7/1/2013
|
General Inspection | 5/8/2013 | 5/8/2013 | 5/8/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 3/22/2013 | 3/22/2013 | 3/25/2013 | | PASS |
Clint A Smith
|
|
|
|