Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberESC13-00065
StatusFinaled
Name RUSTIN RAY
Site Address 6716 E DEER RIDGE ST
Project NameSunnyridge 3 3
Customer Number 
ePlanReviewNo
Description
Per attached ESC conditions.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection8/16/20138/16/20138/16/2013 PASS
DetailsEric Strole
DOC - Permit Finaled8/16/20138/16/20138/16/2013PPASS
DetailsEric Strole
BMP Violation4/30/20135/3/20135/3/2013PPART
DetailsKimberly M. Johnson
General Inspection4/30/20134/30/20134/30/2013PFAIL
DetailsKimberly M. Johnson
LM for RP: Sweep gutter, sidewalk and streets.
BMP Violation3/7/20133/11/20133/11/2013APASS
DetailsEric Strole
BMP Violation3/7/20133/7/20133/7/2013PFAIL
DetailsEric Strole
Left verbal and written correction to clean up all dirt and debris off all hard surfaces, gutter pans, street and clean up all trash and put in container. Have complete by 3-8-13 PM. Will reinspect on 3-11-13 AM
Tracking Control3/4/20133/4/20133/4/2013AFAIL
DetailsJim Storey
8-17-02.1H rp to address/ mid feb verbal to address wash out 8-17-02.4P not resolved.
BMP Violation2/22/20132/25/20132/25/2013APASS
DetailsClint A Smith
BMP Violation2/20/20132/22/20132/22/2013PFAIL
DetailsClint A Smith
No correction have been made. 2nd notice standing. Please refer to the posted correction notice and the previous inspection. Message to RP to have all violations corrected by the end of the business day. Will re-inspect on 2/25/2013. If not corrected, a stop work order will be issued
BMP Violation2/20/20132/21/20132/21/2013PPART
DetailsEric Strole
Verify washout containment has been constructed either on the lot or within the subdivision. Call Jim Storey and Rustin Ray if containment is ready to give go-ahead to pour. OK to pour. Told RP to use washout that is on lot 10.
BMP Violation2/19/20132/20/20132/20/2013AFAIL
DetailsKimberly M. Johnson
Written CN issued 1. clean all dirt off of hard surfaces. 2. move stockpile off of sidewalk. 3. clean up illicit concrete washout on ground. 4. provide effective washout prior to next pour (next pour is scheduled today). Will reinspect 2/22
Site Preparation2/15/20132/15/20132/19/2013 CANC
DetailsJim Storey
Site Preparation2/19/20132/19/20132/19/2013APASS
DetailsJim Storey