Aging Inspection | 10/17/2013 | 10/17/2013 | 10/17/2013 | | DONE |
Evan Jenkins
|
|
|
See Final
|
DOC - Permit Finaled | 10/17/2013 | 10/17/2013 | 10/17/2013 | P | PASS |
Evan Jenkins
|
|
|
Project Complete Vegetation Re-established
|
Aging Inspection | 8/16/2013 | 8/16/2013 | 8/16/2013 | | PASS |
Jim Storey
|
|
|
|
BMP Violation | 3/13/2013 | 3/18/2013 | 3/20/2013 | A | PASS |
Kimberly M. Johnson
|
|
|
|
BMP Violation | 3/12/2013 | 3/13/2013 | 3/13/2013 | A | PART |
Kimberly M. Johnson
|
|
|
concrete washout removed and cleaned up. Stil has dirt in gutter to sweep up and housekeeping to clean up. Will re-inspect monday 3/18
|
Site Preparation | 3/8/2013 | 3/12/2013 | 3/12/2013 | A | DEFR |
Kimberly M. Johnson
|
|
|
Will re-inspect 3/13. Spoke with Grant via telephone about cleanup action; will be complete by end of day. Trash is scheduled to be hauled out Saturday. Crews will use trash bags until then. Garbage has been picked up and plywood placed ontop of container to prevent trash blowing out.
|
Random Inspection | 3/8/2013 | 3/8/2013 | 3/8/2013 | P | FAIL |
Kimberly M. Johnson
|
|
|
concrete washout overflowed onto sidewalk and into stormdrain (dried at time of inspection), witch's hat in gutter needs cleaned out, gutter needs swept, construction trash overflowing and needs haulded off. written CN issued
|
Random Inspection | 2/20/2013 | 2/20/2013 | 2/20/2013 | P | FAIL |
Jim Storey
|
|
|
no sign
|
Site Preparation | 2/19/2013 | 2/19/2013 | 2/19/2013 | P | FAIL |
Jim Storey
|
|
|
no sign
|
Site Preparation | 2/15/2013 | 2/15/2013 | 2/15/2013 | | NR |
Jim Storey
|
|
|
|
Site Final | 5/17/2013 | 5/17/2013 | | A | |
Bob Archibald
|
|
|
|