Site Final | 6/17/2013 | 6/18/2013 | 6/18/2013 | A | PASS |
Jim Sly
|
|
|
David phone
|
DOC - Permit Finaled | 6/18/2013 | 6/18/2013 | 6/18/2013 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 3/5/2013 | 3/5/2013 | 3/5/2013 | A | PASS |
Clint A Smith
|
|
|
Cleaned up yesterday afternoon. Explained to RP to change over the RP name on the sign to match what is on the application.
|
BMP Violation | 3/1/2013 | 3/4/2013 | 3/4/2013 | P | PART |
Clint A Smith
|
|
|
Perimeter controls installed
|
Site Preparation | 2/28/2013 | 2/28/2013 | 3/1/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP; Provide sediment barriers on the North, west and south side of the lot to prevent sediment from discgarging off of the lot. Will follow up on 3/4/2013
|