General Inspection | 12/13/2013 | 12/13/2013 | 12/13/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 12/13/2013 | 12/13/2013 | 12/13/2013 | P | PASS |
Andy J. Long
|
|
|
Townhouse is complete. BLD permit has been finaled. Elevation Ridge BMPs still installed for remainin townhouse construction. No further ESC inspection required for this permit.
|
General Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 | | PASS |
Andy J. Long
|
|
|
No corrections at this time. Townhome is complete and landscaped. BLD permit is still open. House does not have address up yet.
|
General Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 9/10/2013 | 9/10/2013 | 9/10/2013 | | PASS |
Jim Storey
|
|
|
|
General Inspection | 8/9/2013 | 8/9/2013 | 8/9/2013 | | PASS |
Jim Storey
|
|
|
|
General Inspection | 7/9/2013 | 7/9/2013 | 7/9/2013 | | PART |
Kimberly M. Johnson
|
|
|
Need to post ESC sign. LM for RP. Also requested that the contact number on sign is updated with the best number to reach RP at for inspections (cell # ?)
|
General Inspection | 6/6/2013 | 6/6/2013 | 6/6/2013 | | NR |
Clint A Smith
|
|
|
have not begun
|
BMP Violation | 5/1/2013 | 5/6/2013 | 5/3/2013 | A | DONE |
Clint A Smith
|
|
|
Visquen will be removed once excavation of the footing begins
|
General Inspection | 5/1/2013 | 5/1/2013 | 5/1/2013 | | FAIL |
Clint A Smith
|
|
|
Remove the exsisting concrete washout that has been fillied in and not removed. Will re-inspect on 5/6/2013
|
Site Preparation | 3/29/2013 | 3/29/2013 | 3/29/2013 | | PASS |
Clint A Smith
|
|
|
|