Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberESC13-00125
StatusFinaled
Name CHRIS HAWKINS
Site Address 625 N 31ST ST
Project Name30th St Extension Support Act
Customer Number 
ePlanReviewNo
Description
Interim stormwater ponds, stockpile and staging area.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/30/201410/30/201410/30/2014 PASS
DetailsAndy J. Long
No further construction related to this project/permit. Vegetation established in areas, other areas undeveloped awaiting future site of Esther Simplot Park. New submittals for continued work in the area are scheduled. No further ESC inspections required for this permit. No erosion or sediment runoff issues at site.
DOC - Permit Finaled10/30/201410/30/201410/30/2014PPASS
DetailsAndy J. Long
General Inspection10/15/201410/15/201410/15/2014 PASS
DetailsAndy J. Long
No changes at site since prior inspection. No corrections at this time.
General Inspection9/30/20149/30/20149/30/2014 PASS
DetailsEvan Jenkins
No Activity. Large Stockpile of topsoil and concrete rubble pile still onsite. No ESC Issues at this time. Will keep this permit open until the Esther Simplot Project Begins
General Inspection9/15/20149/15/20149/15/2014 PASS
DetailsAndy J. Long
General Inspection8/29/20148/29/20148/29/2014 PASS
DetailsEvan Jenkins
General Inspection8/14/20148/14/20148/14/2014 PASS
DetailsEvan Jenkins
General Inspection7/30/20147/30/20147/30/2014 PASS
DetailsEvan Jenkins
no activity
General Inspection7/15/20147/15/20147/15/2014 PASS
DetailsEvan Jenkins
good vegetative growth on majority of area. Large stockpile still not vegetated nor concrete ruble removed. no other esc issues at time of inspection
General Inspection6/30/20146/30/20146/30/2014 PASS
DetailsAndy J. Long
General Inspection6/13/20146/13/20146/13/2014 PASS
DetailsEvan Jenkins
General Inspection5/29/20145/29/20145/29/2014 PASS
DetailsEvan Jenkins
vegetation almost re-established.
Stockpile in back of ponds needs stabliization practices applied: Tac. Hydroseed or removal
General Inspection5/14/20145/14/20145/14/2014 PASS
DetailsEvan Jenkins
Disturbed areas appear to have been hydroseeded a week or so bacnk.
No violations at time of inspection
General Inspection4/29/20144/29/20144/29/2014 PASS
DetailsEvan Jenkins
General Inspection4/14/20144/14/20144/14/2014 PASS
DetailsAndy J. Long
No activity. Stormwater pond is vegetating.
Need to seed/stabilize the strip of land between pond and Whitewater Blvd.
General Inspection3/28/20143/28/20143/28/2014 PASS
DetailsEvan Jenkins
No issues at time of inspection
General Inspection3/13/20143/13/20143/13/2014 PASS
DetailsEvan Jenkins
No ESC Issues at time of inspection
General Inspection2/26/20142/26/20143/4/2014 PASS
DetailsEvan Jenkins
No ESC Issues at time of inspection
General Inspection2/11/20142/11/20142/11/2014 PASS
DetailsEvan Jenkins
General Inspection1/27/20141/27/20141/27/2014 PART
DetailsEvan Jenkins
Trackout occuring. Contacted RP Greg Williams (Ground FX). Disclosed to him that the construction entrance is filled in and needs to be redone and streets swept
General Inspection1/10/20141/10/20141/10/2014 PASS
DetailsEvan Jenkins
General Inspection12/26/201312/26/201312/26/2013 PASS
DetailsEvan Jenkins
No Activity at time of inspection
General Inspection12/11/201312/11/201312/11/2013 PASS
DetailsEvan Jenkins
No Activity at time of inspection
No ESC Issues
BMP Violation11/26/201311/26/201311/26/2013PDONE
DetailsAndy J. Long
Entry initially intended for ESC13-00563
(Jackson's on State and 31st). Called RP and ACHD to inform about trackout on Whitewater from staging area/public parking.
General Inspection11/26/201311/26/201311/26/2013PPART
DetailsEvan Jenkins
Need to sweep staging area/Whitewater park entrance and provide improved construction entrance. Some track out is due to public access dirt parking lot for Whitewater Park
General Inspection11/18/201311/18/201311/18/2013 PASS
DetailsAndy J. Long
Pond stabilization with hydroseed/mulch has been initiated. Landscaping crews working in surrounding area along Whitewater Blvd. No trackout or other violations observed.
General Inspection11/1/201311/1/201311/1/2013 PASS
DetailsAndy J. Long
Regrading and fill being placed in pond to raise elevation. Stockpiles still in use for project. No corrections at this time.
General Inspection10/17/201310/17/201310/17/2013 PASS
DetailsEvan Jenkins
General Inspection10/2/201310/2/201310/2/2013 PASS
DetailsAndy J. Long
ESC coveriong support activities related to 30th Street extension and Regan Street lift station. BMPs implemented. Permits and SWPPP available on site. Approved
General Inspection9/12/20139/12/20139/17/2013 CANC
DetailsDixie Fellows
cancel per bill
General Inspection9/16/20139/17/20139/17/2013ACANC
DetailsBill VanDegrift
bill. can you meet me at this site and check it over with me?? not sure what to look for..thanks
General Inspection8/28/20138/28/20138/28/2013 PASS
DetailsDaryl Spivey
General Inspection8/13/20138/13/20138/13/2013 CANC
DetailsKimberly M. Johnson
General Inspection7/26/20137/26/20137/26/2013 PASS
DetailsKimberly M. Johnson
Construction still active.
General Inspection7/10/20137/10/20137/11/2013 FAIL
DetailsClint A Smith
Stabilization must be achieved on all portions of the project that are disturbed and have not achieved final stabilization.
General Inspection6/21/20136/21/20136/25/2013 PASS
DetailsClint A Smith
General Inspection6/4/20136/4/20136/4/2013 PART
DetailsClint A Smith
Need to rework the basins bottom infiltration bed
General Inspection5/17/20135/17/20135/22/2013 PASS
DetailsKimberly M. Johnson
General Inspection5/2/20135/2/20135/3/2013 PASS
DetailsClint A Smith
General Inspection4/12/20134/12/20134/12/2013 PASS
DetailsKimberly M. Johnson
General Inspection3/28/20133/28/20133/28/2013 PASS
DetailsClint A Smith
General Inspection3/13/20133/13/20133/15/2013 DONE
DetailsKimberly M. Johnson
Knife river to submit new dewatering plan to the City per conference. New parameters consist of 350 - 700 gpm continuously for 6-10 days.
Site Preparation2/25/20132/25/20132/22/2013 PART
DetailsKimberly M. Johnson
Walked site with Chris Hawkins (RP) and Clint Smith. Contractor in progress of installing SW at perimeter. Discussed proper SW installation and discussed option of an earthern berm in lieu of SW. Also discussed the grading at the north side to limit the amount of runoff reaching the pond. ESC plan shall be incorporated into project SWPPP. Notified contractor to amend project SWPPP and NOI to include the additional 5.5 acre disturbance