General Inspection | 10/30/2014 | 10/30/2014 | 10/30/2014 | | PASS |
Andy J. Long
|
|
|
No further construction related to this project/permit. Vegetation established in areas, other areas undeveloped awaiting future site of Esther Simplot Park. New submittals for continued work in the area are scheduled. No further ESC inspections required for this permit. No erosion or sediment runoff issues at site.
|
DOC - Permit Finaled | 10/30/2014 | 10/30/2014 | 10/30/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/15/2014 | 10/15/2014 | 10/15/2014 | | PASS |
Andy J. Long
|
|
|
No changes at site since prior inspection. No corrections at this time.
|
General Inspection | 9/30/2014 | 9/30/2014 | 9/30/2014 | | PASS |
Evan Jenkins
|
|
|
No Activity. Large Stockpile of topsoil and concrete rubble pile still onsite. No ESC Issues at this time. Will keep this permit open until the Esther Simplot Project Begins
|
General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/29/2014 | 8/29/2014 | 8/29/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 8/14/2014 | 8/14/2014 | 8/14/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/30/2014 | 7/30/2014 | 7/30/2014 | | PASS |
Evan Jenkins
|
|
|
no activity
|
General Inspection | 7/15/2014 | 7/15/2014 | 7/15/2014 | | PASS |
Evan Jenkins
|
|
|
good vegetative growth on majority of area. Large stockpile still not vegetated nor concrete ruble removed. no other esc issues at time of inspection
|
General Inspection | 6/30/2014 | 6/30/2014 | 6/30/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/13/2014 | 6/13/2014 | 6/13/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/29/2014 | 5/29/2014 | 5/29/2014 | | PASS |
Evan Jenkins
|
|
|
vegetation almost re-established. Stockpile in back of ponds needs stabliization practices applied: Tac. Hydroseed or removal
|
General Inspection | 5/14/2014 | 5/14/2014 | 5/14/2014 | | PASS |
Evan Jenkins
|
|
|
Disturbed areas appear to have been hydroseeded a week or so bacnk. No violations at time of inspection
|
General Inspection | 4/29/2014 | 4/29/2014 | 4/29/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/14/2014 | 4/14/2014 | 4/14/2014 | | PASS |
Andy J. Long
|
|
|
No activity. Stormwater pond is vegetating. Need to seed/stabilize the strip of land between pond and Whitewater Blvd.
|
General Inspection | 3/28/2014 | 3/28/2014 | 3/28/2014 | | PASS |
Evan Jenkins
|
|
|
No issues at time of inspection
|
General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 | | PASS |
Evan Jenkins
|
|
|
No ESC Issues at time of inspection
|
General Inspection | 2/26/2014 | 2/26/2014 | 3/4/2014 | | PASS |
Evan Jenkins
|
|
|
No ESC Issues at time of inspection
|
General Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/27/2014 | 1/27/2014 | 1/27/2014 | | PART |
Evan Jenkins
|
|
|
Trackout occuring. Contacted RP Greg Williams (Ground FX). Disclosed to him that the construction entrance is filled in and needs to be redone and streets swept
|
General Inspection | 1/10/2014 | 1/10/2014 | 1/10/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/26/2013 | 12/26/2013 | 12/26/2013 | | PASS |
Evan Jenkins
|
|
|
No Activity at time of inspection
|
General Inspection | 12/11/2013 | 12/11/2013 | 12/11/2013 | | PASS |
Evan Jenkins
|
|
|
No Activity at time of inspection No ESC Issues
|
BMP Violation | 11/26/2013 | 11/26/2013 | 11/26/2013 | P | DONE |
Andy J. Long
|
|
|
Entry initially intended for ESC13-00563 (Jackson's on State and 31st). Called RP and ACHD to inform about trackout on Whitewater from staging area/public parking.
|
General Inspection | 11/26/2013 | 11/26/2013 | 11/26/2013 | P | PART |
Evan Jenkins
|
|
|
Need to sweep staging area/Whitewater park entrance and provide improved construction entrance. Some track out is due to public access dirt parking lot for Whitewater Park
|
General Inspection | 11/18/2013 | 11/18/2013 | 11/18/2013 | | PASS |
Andy J. Long
|
|
|
Pond stabilization with hydroseed/mulch has been initiated. Landscaping crews working in surrounding area along Whitewater Blvd. No trackout or other violations observed.
|
General Inspection | 11/1/2013 | 11/1/2013 | 11/1/2013 | | PASS |
Andy J. Long
|
|
|
Regrading and fill being placed in pond to raise elevation. Stockpiles still in use for project. No corrections at this time.
|
General Inspection | 10/17/2013 | 10/17/2013 | 10/17/2013 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 10/2/2013 | 10/2/2013 | 10/2/2013 | | PASS |
Andy J. Long
|
|
|
ESC coveriong support activities related to 30th Street extension and Regan Street lift station. BMPs implemented. Permits and SWPPP available on site. Approved
|
General Inspection | 9/12/2013 | 9/12/2013 | 9/17/2013 | | CANC |
Dixie Fellows
|
|
|
cancel per bill
|
General Inspection | 9/16/2013 | 9/17/2013 | 9/17/2013 | A | CANC |
Bill VanDegrift
|
|
|
bill. can you meet me at this site and check it over with me?? not sure what to look for..thanks
|
General Inspection | 8/28/2013 | 8/28/2013 | 8/28/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/13/2013 | 8/13/2013 | 8/13/2013 | | CANC |
Kimberly M. Johnson
|
|
|
|
General Inspection | 7/26/2013 | 7/26/2013 | 7/26/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Construction still active.
|
General Inspection | 7/10/2013 | 7/10/2013 | 7/11/2013 | | FAIL |
Clint A Smith
|
|
|
Stabilization must be achieved on all portions of the project that are disturbed and have not achieved final stabilization.
|
General Inspection | 6/21/2013 | 6/21/2013 | 6/25/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/4/2013 | 6/4/2013 | 6/4/2013 | | PART |
Clint A Smith
|
|
|
Need to rework the basins bottom infiltration bed
|
General Inspection | 5/17/2013 | 5/17/2013 | 5/22/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 5/2/2013 | 5/2/2013 | 5/3/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/12/2013 | 4/12/2013 | 4/12/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 3/28/2013 | 3/28/2013 | 3/28/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/13/2013 | 3/13/2013 | 3/15/2013 | | DONE |
Kimberly M. Johnson
|
|
|
Knife river to submit new dewatering plan to the City per conference. New parameters consist of 350 - 700 gpm continuously for 6-10 days.
|
Site Preparation | 2/25/2013 | 2/25/2013 | 2/22/2013 | | PART |
Kimberly M. Johnson
|
|
|
Walked site with Chris Hawkins (RP) and Clint Smith. Contractor in progress of installing SW at perimeter. Discussed proper SW installation and discussed option of an earthern berm in lieu of SW. Also discussed the grading at the north side to limit the amount of runoff reaching the pond. ESC plan shall be incorporated into project SWPPP. Notified contractor to amend project SWPPP and NOI to include the additional 5.5 acre disturbance
|