General Inspection | 8/19/2013 | 8/22/2013 | 8/22/2013 | A | PART |
Bill VanDegrift
|
|
|
sign posted, working in driveway will clean it back up this evening
|
General Inspection | 8/16/2013 | 8/16/2013 | 8/19/2013 | | PASS |
Bill VanDegrift
|
|
|
final ok
|
Site Final | 8/19/2013 | 8/19/2013 | 8/19/2013 | P | PASS |
Bill VanDegrift
|
|
|
final ok
|
General Inspection | 7/16/2013 | 7/16/2013 | 7/17/2013 | | PART |
Clint A Smith
|
|
|
Minor touch work on landscaping is being completed
|
General Inspection | 6/13/2013 | 6/13/2013 | 6/17/2013 | | PASS |
Clint A Smith
|
|
|
|
Stop Work Order | 5/13/2013 | 5/13/2013 | 5/14/2013 | P | PASS |
Clint A Smith
|
|
|
All clean up has been completed
|
Complaint Inspection | 5/13/2013 | 5/13/2013 | 5/13/2013 | P | FAIL |
Clint A Smith
|
|
|
MOved to a stop work order
|
General Inspection | 4/19/2013 | 4/19/2013 | 4/19/2013 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 3/18/2013 | 3/19/2013 | 3/19/2013 | P | PART |
Clint A Smith
|
|
|
Residual swept up. Have plaed check dams in gutter pan to capture any further drainage.
|
Random Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 | P | FAIL |
Kimberly M. Johnson
|
|
|
Washout in gutter; entered stormdrain. Spoke to Ryan (RP) 3/18
|
General Inspection | 3/6/2013 | 3/6/2013 | 3/6/2013 | | PASS |
Daryl Spivey
|
|
|
talked to cont. on site and told him to keep roadway clean...........ds
|