General Inspection | 6/26/2014 | 6/26/2014 | 6/26/2014 | | PASS |
Andy J. Long
|
|
|
|
DOC - Permit Finaled | 6/26/2014 | 6/26/2014 | 6/26/2014 | P | PASS |
Andy J. Long
|
|
|
Home is complete. BLD finaled. ESC conditions satisfied. No further inspections required.
|
General Inspection | 5/26/2014 | 5/26/2014 | 5/28/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 | | PASS |
Andy J. Long
|
|
|
Homeowner contractor has finished house and is occupied. The yard is not yet stabilized/landscaped. Temp BMPs still installed, no corrections required. BLD permit finaled. Pool permit has been closed.
|
General Inspection | 3/24/2014 | 3/24/2014 | 3/24/2014 | | PASS |
Evan Jenkins
|
|
|
no esc issues at time of insection
|
General Inspection | 2/20/2014 | 2/20/2014 | 2/20/2014 | | PASS |
Andy J. Long
|
|
|
Permit posted. Silt fence along front slope in good condition. DI protection provided. Will need to remove/ empty bag at end of construction. No corrections required.
|
General Inspection | 1/20/2014 | 1/20/2014 | 1/20/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 12/19/2013 | 12/19/2013 | 12/19/2013 | | PASS |
Andy J. Long
|
|
|
Permit posted, silt fence BMP installed downslope of construction. No activity at time of inspection, no corrections required.
|
General Inspection | 11/18/2013 | 11/18/2013 | 11/18/2013 | | PASS |
Andy J. Long
|
|
|
Corrections have been made since prior inspection:
1. Permit posted with permit # and contact info 2. Silt fence is in operating condition.
No other violations/corrections necessary observed. WIP.
|
General Inspection | 10/18/2013 | 10/18/2013 | 10/18/2013 | | PART |
Evan Jenkins
|
|
|
Called Robert, left message to replace construction sign with contact info written on it, and also to tighten up silt fence that runs the perimeter of the project. Will re-inspect next monday
|
General Inspection | 9/17/2013 | 9/17/2013 | 9/17/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/16/2013 | 8/16/2013 | 8/19/2013 | | PASS |
Dave Hannah
|
|
|
|
General Inspection | 7/16/2013 | 7/16/2013 | 7/17/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/7/2013 | 6/13/2013 | 6/13/2013 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/5/2013 | 6/7/2013 | 6/7/2013 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP; Tighten up the silt fence, Provde a stabilized construction access. Remove the grave bags located within the gutterpan. Prior to the placement of concrete, provide a washout pit or washout sealed container. Will follow up on 6/13/13
|
Site Preparation | 5/27/2013 | 5/27/2013 | 5/28/2013 | | CANC |
Kimberly M. Johnson
|
|
|
Holiday
|