Aging Inspection | 4/20/2015 | 4/20/2015 | 4/20/2015 | | PASS |
Andy J. Long
|
|
|
Home complete and ESC permit conditions satisfied. Site has been cleaned with no loose sediment or construction materials remaining on site.
|
DOC - Permit Finaled | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 2/16/2015 | 2/16/2015 | 2/20/2015 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 12/15/2014 | 12/15/2014 | 12/15/2014 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 10/13/2014 | 10/13/2014 | 10/13/2014 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 8/11/2014 | 8/11/2014 | 8/11/2014 | | PASS |
Andy J. Long
|
|
|
Work has resumed after extended period of inactivity. No violations or ESC issues observed at time of inspection. Mostly interior work remaining as well exterior landscaping/stabiliztion.
|
Aging Inspection | 6/9/2014 | 6/9/2014 | 6/9/2014 | | PASS |
Andy J. Long
|
|
|
Project appears to be on hold. House frame is built but not finished. No sediment or discharges leaving site.
|
Aging Inspection | 4/7/2014 | 4/7/2014 | 4/7/2014 | | NR |
Evan Jenkins
|
|
|
No Activity Present
|
Aging Inspection | 2/3/2014 | 2/3/2014 | 2/3/2014 | | PASS |
Evan Jenkins
|
|
|
No Activity Present No ESC Issues at time of inspection
|
Aging Inspection | 12/3/2013 | 12/3/2013 | 12/3/2013 | | DONE |
Bob Reichert
|
|
|
looked ok
|
Aging Inspection | 10/2/2013 | 10/2/2013 | 10/3/2013 | | PASS |
Andy J. Long
|
|
|
No activity at time of inspection but project is not complete. Site has permit posted on fence and construction entrance preventing track out. No ESC violations.
|
BMP Violation | 5/29/2013 | 5/30/2013 | 6/3/2013 | P | PASS |
Eric Strole
|
|
|
Corrections complete
|
BMP Violation | 5/29/2013 | 5/29/2013 | 5/29/2013 | A | FAIL |
Eric Strole
|
|
|
Spoke with RP and he will move port a pot away from street and will clean up tracking by days end. Will recheck 5-30 -13 pm
|
Site Preparation | 4/19/2013 | 4/19/2013 | 4/19/2013 | P | PASS |
Eric Strole
|
|
|
Spoke with RP and went over tracking and having a concrete wash out pryer to next pour.
|
Site Preparation | 4/4/2013 | 4/4/2013 | 4/5/2013 | | NR |
Clint A Smith
|
|
|
|