Site Final | 11/4/2015 | 11/5/2015 | 11/5/2015 | P | PASS |
Andy J. Long
|
|
|
1 PM site walkthrough with Brighton RP Zach
All parcels are complete except for 2 lots in River Heights #5, which have been sold to Alturas Construction. New SFH construction on these lots will start before end of the year and will be permitted seperately.
All disturbed areas and common areas have been landscaped and stabilized. No temporary BMPs other that DI bags are installed. Brighton will remove DI sediment bags at the east end of sub but the DIs at the west end will remain until the two final homes are built up. Brighton or Alturas have agreed to remove those upon my request.
No further inspections required on this permit. CGP NOI to be terminated shortly
|
DOC - Permit Finaled | 11/5/2015 | 11/5/2015 | 11/5/2015 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | CANC |
Andy J. Long
|
|
|
data entry error
|
General Inspection | 10/27/2015 | 10/27/2015 | 10/27/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/12/2015 | 10/12/2015 | 10/12/2015 | | PASS |
Andy J. Long
|
|
|
Streets, sidewalks and gutters free of trackout, loose sediment, or other discharges. BMPs installed througout RH#5. No corrections. SFH work in progress by Brighton and Alturas.
|
General Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 | | PASS |
Andy J. Long
|
|
|
5 SFHs currently in progress in RH#5 and 2 open lots. DI bags in subdivision storm drains have been maintained and have remaining capactity. Streets and gutters free of loose sediment or material spills. Lined washout located on Grand Prairie. No corrections at this time.
|
General Inspection | 9/10/2015 | 9/10/2015 | 9/10/2015 | | PASS |
Andy J. Long
|
|
|
WIP on SFHs in RH#5 by Brighton and Alturas. Streets and gutters do not have loose sediment or trackout. Most of phase complete excepet upper street Grand Prairie. Lined washout provided off Grand Prairie. No corrections for subdivision BMPs
|
General Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/11/2015 | 8/11/2015 | 8/11/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/27/2015 | 7/27/2015 | 7/27/2015 | | PASS |
Andy J. Long
|
|
|
WIP on homes on Grand Prairie (upper side of loop). Contractors taking care to keep clean even though 5 homes going at once. No significant amount of sediment, trackout, or building materials in gutters and street. No spills or discharges observed. BMPs installed as needed. No corrections.
|
General Inspection | 7/10/2015 | 7/10/2015 | 7/10/2015 | | PART |
Andy J. Long
|
|
|
No significant blowouts or erosion occured during storm. SFHs in progress, workers staying off muddy areas, no trackout observed. No discharges occuring.
Correction:
Sweep around two DIs and change out sediment bags at RH#5 entrance.
Notified Brighton RP.
|
General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/10/2015 | 6/10/2015 | 6/10/2015 | | PASS |
Evan Jenkins
|
|
|
No issues at this time
|
General Inspection | 5/26/2015 | 5/26/2015 | 5/26/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/11/2015 | 5/11/2015 | 5/11/2015 | | PART |
Andy J. Long
|
|
|
Streets and gutters free of significant amounts of loose sediment. DIs have filter bag inserts installed. SFHs in progress have trashed contained and workers staying off open areas to prevent trackout.
Correction: - concrete washout is approx. 75% and needs to dry and be removed. A new pit may be required if this one does not dry/evaporate.
|
General Inspection | 4/24/2015 | 4/24/2015 | 4/24/2015 | | PASS |
Andy J. Long
|
|
|
Streets, gutters, and storm drain inlets do not have any sediment accumulations. No trackout from sites. Lined washout and DI bags have remaining capacity. RH#5 is over 70% full. No corrections at this time. Site still being inspected by Brighton RP for CGP compliance.
|
General Inspection | 4/9/2015 | 4/9/2015 | 4/9/2015 | | PASS |
Andy J. Long
|
|
|
WIP. River Heights 5 BMPs are installed. No major trackout. Landscapers are applying bark chips/mulch on areas between sidewalk and sweeping up loose bark from the road as I was on site.
Approved. About 70% lots are now built out.
|
General Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 | | PASS |
Andy J. Long
|
|
|
Home in progress on Grand Prairie and Playwright currently. Stockpiles from foundations are being stored in contained location to prevent sediment runoff. Lined washout provided for developers (Brighton & Alturus). Roads and gutters free of loose sediment, no hillside erosion observed on upper end.
Approved.
|
General Inspection | 3/10/2015 | 3/10/2015 | 3/10/2015 | P | PASS |
Andy J. Long
|
|
|
Inlet protection currently in good condtion. Limited trackout, but will need to do maintenance on construction entrance if that will continue to be a staging/stockpiling area. Currently no issues.
Washout is being used, no windblown trash issues.
Approved.
|
General Inspection | 3/6/2015 | 3/6/2015 | 3/10/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/19/2015 | 2/19/2015 | 2/23/2015 | | PASS |
Andy J. Long
|
|
|
RH #5 in progress. DI bags have remaining capacity. Will need to be swept at end of week - lots of SFH activity and contractors parking on street. Staying off open areas. Some stockpiling in central area is occuring but stored in low risk spot.
No corrective actions needed due to no erosion, trackout, or discharges. Just need to continue housekeeping efforts. Will continue to monitor.
|
General Inspection | 2/4/2015 | 2/4/2015 | 2/4/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 | | PASS |
Andy J. Long
|
|
|
Permit and SWPPP onsite for River Heights #5. Individual homes permitted seperately. BMPs including DI bags and lined concrete washout with stabilized drive-up are in good operating condition. No signiificant trackout and no on or offisite discharges observed
|
General Inspection | 1/5/2015 | 1/5/2015 | 1/5/2015 | | PASS |
Andy J. Long
|
|
|
No trackout to streets within RH#5 sub; no active excavation or cement foundation work occuring - all active project have been framed and are getting finishing touches. Some ponding in center of sub will need to be monitored to make sure it doesn't overflow or cause sediment runoff. No hillside erosion observed on slope areass, most of which are vegetated. Permit and SWPP on site. Approved.
|
General Inspection | 12/19/2014 | 12/19/2014 | 12/19/2014 | | PASS |
Andy J. Long
|
|
|
Streets clean, drop inlets protected. Individual homes with seperate ESC permits. No corrections needed at this time. BMPs implemented.
|
General Inspection | 12/4/2014 | 12/4/2014 | 12/4/2014 | | PASS |
Andy J. Long
|
|
|
Streets, sidewalks, and gutters are free of trackout or sediment accumulation. Stormdrains have sediment protection. Brighton has switched over to using Compliance Solutions washout container, which is an improvement and prevent infiltration of stormwater.
Individual homes in progress. River Heights #5 development is currently in compliance.
|
General Inspection | 11/19/2014 | 11/19/2014 | 11/19/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/4/2014 | 11/4/2014 | 11/4/2014 | | PASS |
Andy J. Long
|
|
|
Riverheights #5 is currently in good condition. No blowouts or erosion issues from the weekend storm and no trackout from open lots observed. No corrections at this time.
|
General Inspection | 10/20/2014 | 10/20/2014 | 10/20/2014 | | PASS |
Andy J. Long
|
|
|
Riverheights #5 has about 65% of the lots filled. Open area is being used for landscaping staging and some stockpiles. There is a construction entrance into this area. Lined concrete washout is installed and has remaining capacity. All stormdrain inlets have filter bag protection. No trackout or other violations. Approved.
|
General Inspection | 10/3/2014 | 10/3/2014 | 10/3/2014 | | PASS |
Evan Jenkins
|
|
|
no issues at this time
|
General Inspection | 9/17/2014 | 9/18/2014 | 9/18/2014 | P | PASS |
Andy J. Long
|
|
|
BMPs installed and no significant amounts of sediment leaving lots or accumulating in gutters.. DI bags have remaining capacity.
Landscapers that are working today have spilled some small rocks that they will sweep up at the end of the day.
|
General Inspection | 9/17/2014 | 9/17/2014 | 9/17/2014 | | CANC |
Andy J. Long
|
|
|
ESC conference. Rescheduled for 9/18
|
General Inspection | 9/2/2014 | 9/2/2014 | 9/2/2014 | | PASS |
Andy J. Long
|
|
|
River Heights #5 is in good condition. DI bags installed and have remaining capacity. No discharges, trackout, or sediment accumulation in streets/gutters. No corrections required at this. SWPPP and permit posted at site.
|
General Inspection | 8/18/2014 | 8/18/2014 | 8/18/2014 | | PASS |
Andy J. Long
|
|
|
RH #5 currently in compliance. No trackout, illicit discharges, or violations observed. BMPs are being maintained.
|
General Inspection | 8/1/2014 | 8/1/2014 | 8/1/2014 | | PASS |
Andy J. Long
|
|
|
RH #5 BMPs are in good condition. Streets and gutters very clean. No corrections necessary.
|
General Inspection | 7/17/2014 | 7/17/2014 | 7/17/2014 | | PASS |
Andy J. Long
|
|
|
Streets and gutters in River Heights #5 are relatively clean and free of sediment. DI bags are installed and in good condition. Brighton RP Danial Frisbee conducting regular SWPPP inspections.
|
General Inspection | 7/2/2014 | 7/2/2014 | 7/2/2014 | | PASS |
Andy J. Long
|
|
|
Riverheights #5 in good conditions. DI bags have remaining capacity and streets and sidewalks are relatively dirt free. Concrete washout also in good condition. No corrections at this time.
|
General Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 | | PASS |
Andy J. Long
|
|
|
RH #5 is in full progress with over 50% parcel complete or with active construction.
Roads are relatively clean and storm drains have protection. Concrete washout line pit is in good condition and being utilized.
No discharges, trackout or other violations observed at time of inspection. Approved.
|
General Inspection | 6/2/2014 | 6/2/2014 | 6/2/2014 | | PASS |
Andy J. Long
|
|
|
River Heights 5 has about 50% of all parcels complete or in progress. Central area is being used for landscape stockpile operations, the construction entrance installed is in good condition. DI bags and concrete washout pit have remaining capacity.
Some dirt in gutters but many contractor vehicles line the street. Will need to be address in next schedule street cleaning.
|
General Inspection | 5/16/2014 | 5/16/2014 | 5/16/2014 | | PASS |
Andy J. Long
|
|
|
Streets in good condition. Neighborhood has DI bags, lined concrete washout with stabilized access, and construction entrance to center parcel. Some minor trackout observed, but will be addressed with routine sweeping.
|
General Inspection | 5/1/2014 | 5/1/2014 | 5/1/2014 | | PASS |
Andy J. Long
|
|
|
River Heights #5 in decent condition. Some minor trackout. Cement washout and DI bags are adequately maintained. Will need to bolster the construction entrance that has been desiganted near the entrance.
|
BMP Violation | 4/16/2014 | 4/16/2014 | 4/16/2014 | A | PART |
Andy J. Long
|
|
|
Follow up inspection to check that illicit washout and curb cut material have been cleaned and DI bags emptied.
Inspection notes: - DI bags at downslope west end have been emptied/maintained as requested. - Streets were swept on Monday 4/14. - Some of the debris and washout areas used by A-Core have been cleaned and removed.
Remaining corrections: Complete clean up of mess in gutters made by the concrete cutting crew. Still observing concrete dust/crust in gutters and some areas where washout/slop was placed.
|
General Inspection | 4/9/2014 | 4/9/2014 | 4/9/2014 | | PASS |
Andy J. Long
|
|
|
Lots of activity on Brighton Homes projects. No major issues but end of day clean up will need to be maintained. No trackout outside of development. Permits posted, stormdrain structures are protected. Approved for now.
|
Random Inspection | 3/25/2014 | 3/25/2014 | 3/25/2014 | P | PART |
Andy J. Long
|
|
|
Riverheights #5 streets and BMPs in decent condition and sub-cons following rules. Weekly SWPPP inspections being conductined by RP Daniel Frisbee. Last inspection 3/19 -noted that DI bags are okay but I observed 2-3 bags on River Basin that are near capacity.
Daniel informed to tell Syman Co. to empty out those DI bags before this next rain event (later this week/next week).
|
General Inspection | 3/17/2014 | 3/17/2014 | 3/17/2014 | | PASS |
Andy J. Long
|
|
|
No subdivision development activity at time of inspection. Roads are clean, DI's have protection and contractors are staying off open spaces with mud. Brighton Home sites are looking acceptable, with some sweeping/end of day clean up needed on the west end homesites.
|
General Inspection | 2/28/2014 | 2/28/2014 | 3/4/2014 | | PASS |
Andy J. Long
|
|
|
Riverheights #5 is good condition after recent precipitation. BMPs at westend contained water and sediment. No trackout. Weekly SWPPP inspections have been completed by Danial Frisby. Streets were swept last week. In compliance at this time.
|
Random Inspection | 2/13/2014 | 2/13/2014 | 2/13/2014 | A | PASS |
Andy J. Long
|
|
|
Berm at west end of central area contained runoff and groundwater melt. Perimeter wattles and washout in good condition at this time. Brighton Homes has been told to improved daily house keeping on individual home sites.
|
Random Inspection | 2/6/2014 | 2/6/2014 | 2/6/2014 | P | PASS |
Andy J. Long
|
|
|
Checked conditions. Snow has not melted. Will check back to see if new berms and wattles will contain/trap sediment. No trackout on roads. All houses under construction have active ESC permits. No corrections at this time.
|
General Inspection | 2/3/2014 | 2/3/2014 | 2/3/2014 | | PASS |
Andy J. Long
|
|
|
Westend of central area is bermed to contain snow melt. Streets are clean. No corrections at this time.
|
Random Inspection | 1/17/2014 | 1/17/2014 | 1/17/2014 | P | PASS |
Andy J. Long
|
|
|
Berm has been built on west end of central area in addition to wattles lining the sidewalk Should contain and filter runoff. DI bags exchanged. Whole square was swept on 1/16. Sweeping service is marginal. Site has been cleaned up and additional protection added. No further corrections at this time.
|
Conference | 1/10/2014 | 1/10/2014 | 1/10/2014 | A | DONE |
Andy J. Long
|
|
|
Meet Brighton Corp. Danial on-site during inspection rounds.
1. Re-inspection fee will be paid today 2. Containment berms and wattles will be installed at areas where runoff occured. 3. Drop inlet bags have already been changed. 4. Stormwater system in Riverheights is self-contained with sediment traps and French drains. Sediment traps should be inspected and pumped if necessary. 5. Syman and Brighton excavotor contractor will begin to make changes ASAP. 6. A revised ESC site map reflecting changes shall be submitted to PDS.
|
Random Inspection | 1/9/2014 | 1/9/2014 | 1/9/2014 | P | FAIL |
Andy J. Long
|
|
|
West side of central area needs silt fence protection and possibly a sediment basin. Snow melt runoff running into street and stormwater infrastructure. No new signage observed. No payment of previously issued re-inspection fee.
Called Brighton SWPPP contact Daniel Frisbee to request corrections as soon as conditions allow. Pictures of event are on file.
|
BMP Violation | 1/2/2014 | 1/2/2014 | 1/2/2014 | P | PART |
Andy J. Long
|
|
|
Conference on-site with Brighton Corp. contact Danial Frisbee to discuss SWO issued in regards to insufficient BMPs per the approved ESC plan & map.
Actions:
1. Two construction entrances have been installed at NW corner for stockpile access per previous CN/SWO and ESC site map. 2. Site map has been updated; record of changes logged in Inspection portion of SWPPP binder. 3. Stop Work Order has been removed 4. Re-inspection fee applied to permit/bond. Notified Brighton that this must be paid ASAP.
Additional corrections discussed.
1. Concrete washout to be emptied by Syman Co. 2. New entrances to be elongated 3. Dirt on sidewalks for unauthorized access points will be cleaned. 4. Signs will be posted in the areas where empty space was being accessed without proper construction entrance.
Will be notified when corrections are complete, compliance deadline is next Friday 1/10/14
|
Complaint Inspection | 12/20/2013 | 12/20/2013 | 12/20/2013 | P | FAIL |
Andy J. Long
|
|
|
Corrections from previous notice 10/15 not completed. Need to install construction entrances per SWPPP map or request a modification and prohibit unauthorized entrances.
Increase sweeping or enforce daily housekeeping on individual home sites.
SWO posted; re-inspection required.
|
General Inspection | 12/17/2013 | 12/17/2013 | 12/17/2013 | | FAIL |
Andy J. Long
|
|
|
Non-compliance due to Brighton Homes operations. Need to coordinate with Brighton Homes to clean up trackout.
|
General Inspection | 12/2/2013 | 12/2/2013 | 12/2/2013 | | PART |
Andy J. Long
|
|
|
Stabilization of central area in progress. Contractors still accessing stockpile areas and sidewalks in undesignated spots causing track out. New washout has been provided. No track outside of development.
Corrections: 1. Restrict access to open areas 2. Sweep up track out
|
General Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 | | PASS |
Andy J. Long
|
|
|
Subdivision BMPs in good condition. Central area has been hydroseeded and is also to be used for stockpiling - construction entrance provided. Fencing and landscaping appears to be complete. Brighton Homes has just started the first home in Phase 5. Concrete washout <25% full.
No corrections at this time.
|
Conference | 10/31/2013 | 10/31/2013 | 10/31/2013 | P | DONE |
Andy J. Long
|
|
|
Telephone conference with RP Jay Walker and Brighton inspector Daniel. Discussed the following: 1. Landscapers, fence builders, and others are currently causing track out due to not using construction entrances.
2. Due to subdivision grading process, initial entrances have been removed at this time.
3. All grading will be finished by 1st week of November
4. Street cleanup once grading has been completed. 5. Hydroseeding will occur within 14 days for stabilization.
|
General Inspection | 10/30/2013 | 10/30/2013 | 10/30/2013 | | PART |
Andy J. Long
|
|
|
Drop inlet protection, cement washout and wattle protecting canal on west side are in good condition. SWPPP onsite, last inspection by Daniel Frisbie (###-####) on 10/23/13.
Corrections: - Provide construction entrance for NW parcel and clean existing trackout -Clean mud out of gutter on SE parcel, provide entrance if necessary.
|
General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 | P | FAIL |
Evan Jenkins
|
|
|
Correction Notice Issued: Sweep all streets to remove exess trackout. Remove Dirt Ramps throughout Project. Install 3 Construction Entrances per site plan
|
General Inspection | 10/2/2013 | 10/2/2013 | 10/2/2013 | | FAIL |
Evan Jenkins
|
|
|
No ESC Signage Silt Fence Needs Replacing Stockpile been inactive over 14 days: Needs Stabilization Practices Initiated
|
General Inspection | 9/17/2013 | 9/17/2013 | 9/17/2013 | | CANC |
Bill VanDegrift
|
|
|
|
General Inspection | 8/16/2013 | 8/16/2013 | 8/21/2013 | | PASS |
Bob Reichert
|
|
|
looked ok, talked with excavator
|
General Inspection | 8/1/2013 | 8/1/2013 | 8/2/2013 | | PART |
Kimberly M. Johnson
|
|
|
Silt fence needs repaired. Entire site looks to be active. Dust under control despite traffic on disturbed area and earth work
|
General Inspection | 7/17/2013 | 7/17/2013 | 7/17/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/28/2013 | 6/28/2013 | 6/28/2013 | | PART |
Clint A Smith
|
|
|
Verbal to contractor; Flair out the exit on the left hand side.
|
General Inspection | 6/13/2013 | 6/13/2013 | 6/13/2013 | | PART |
Clint A Smith
|
|
|
Verbal to GC; extend the exit to the east
|
General Inspection | 5/23/2013 | 5/29/2013 | 5/29/2013 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/23/2013 | 5/23/2013 | 5/23/2013 | | FAIL |
Clint A Smith
|
|
|
Message to RP; Post ESC sign at the front of the job and locate EC plan at the jobsite to verify his controls. Maintain construction exit. Add additional sediment barrier at the exit next to the irragation canal crossing onto Warmsprings Ave. Will follow up next week.
|
General Inspection | 9/2/2013 | 9/2/2013 | | | |
Eric Strole
|
|
|
|