Site Final | 1/29/2014 | 1/29/2014 | 1/29/2014 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 1/29/2014 | 1/29/2014 | 1/29/2014 | P | PASS |
Mike Jordan
|
|
|
|
Aging Inspection | 1/2/2014 | 1/2/2014 | 1/2/2014 | | PASS |
Andy J. Long
|
|
|
Some interior work remaining. No corrections at this time. Site is clean.
|
Random Inspection | 10/28/2013 | 10/28/2013 | 10/28/2013 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 10/22/2013 | 10/22/2013 | 10/22/2013 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 8/9/2013 | 8/9/2013 | 8/9/2013 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 7/26/2013 | 7/26/2013 | 7/26/2013 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 7/8/2013 | 7/8/2013 | 7/8/2013 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 6/13/2013 | 6/13/2013 | 6/13/2013 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP; Maintain all sotrm drain inlets and remove all sediment and debris off of the hard surface. Provide a stabilized construction exit where construction bins and material are being stored on the disturbed area of the subdivision. Will follow up once RP schedules another site prep inspection.
|