Site Final | 11/26/2013 | 11/27/2013 | 11/26/2013 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 11/26/2013 | 11/26/2013 | 11/26/2013 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 11/26/2013 | 11/26/2013 | 11/26/2013 | P | PASS |
Jim Sly
|
|
|
|
Aging Inspection | 10/31/2013 | 10/31/2013 | 10/31/2013 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 6/13/2013 | 6/13/2013 | 6/13/2013 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP; clean up all trash debris surround the units. Clean up the concrete residual and provide a washout pit prior to the next pour date.
|