General Inspection | 12/3/2013 | 12/3/2013 | 12/3/2013 | | DONE |
Evan Jenkins
|
|
|
see final
|
DOC - Permit Finaled | 12/3/2013 | 12/3/2013 | 12/3/2013 | P | PASS |
Evan Jenkins
|
|
|
Vegetation Re-established Contacted RP, he stated they are ready for all permits to be finaled. I explained to him that the contractor needs to call PDS and request a final inspection before a permit is finaled out
|
General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 | | PART |
Andy J. Long
|
|
|
Pre-fab building has already been installed. Evidence of uncontained cement washout; wattle still in place. BLD permit is still open. Need to clean up cement and remove wattle. Left written correction notice.
|
General Inspection | 8/28/2013 | 8/28/2013 | 8/28/2013 | | PEND |
Dixie Fellows
|
|
|
i called mark and he said they haven't started this job yet. his # is 1-###-####
|
General Inspection | 7/10/2013 | 7/10/2013 | 7/10/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/24/2013 | 5/24/2013 | 5/24/2013 | | NR |
Clint A Smith
|
|
|
|