Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC13-00288
StatusFinaled
Name JAMES LARKIN
Site Address 8650 W SHOUP DR
Project NamePINETREE VILLAGE NO 5
Customer Number 
ePlanReviewNo
Description
Final stabilization expected 7/17/2013
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection8/25/20148/25/20148/25/2014 PASS
DetailsAndy J. Long
Finaled.
DOC - Permit Finaled8/25/20148/25/20148/25/2014PPASS
DetailsAndy J. Long
Bond for this portion of Pinetree Village #5 has been released. All subdivision infrastructure is installed and individual parcels have ESC permits. Open area covered under ESC13-00924.

ESC conditions satisfied.
Aging Inspection6/24/20146/24/20146/24/2014 PASS
DetailsAndy J. Long
Pinetree #5 streets and infrastructure are developed. Some parcels remain in progress as well as landscaping/stabilization of open spaces. No corrections required at this time.
Conference4/24/20144/24/20144/24/2014PDONE
DetailsAndy J. Long
Entire ESC plan and installations need maintenance. May enact parcel holds on all inspections. Will wait to see if Mike Jordan feels his CN has been acknowledged.
General Inspection4/7/20144/8/20144/8/2014APASS
DetailsAndy J. Long
Rescheduled from Monday 4/7
Aging Inspection4/7/20144/7/20144/7/2014 CANC
DetailsAndy J. Long
Unable to make due to afternoon training session. Reschuled for Tuesday 4/8
General Inspection2/3/20142/3/20142/3/2014 PASS
DetailsAndy J. Long
Road re-alignment is in progress. Some minor track out from equipment onto Evening Star. RP Jim on site, will sweep at end of the day. Approved.
General Inspection12/3/201312/3/201312/3/2013 PASS
DetailsAndy J. Long
WIP. Vertical construction very active. BMPs include washout, bi-weekly sweeping, and DI protection. CGP filed.
General Inspection10/1/201310/1/201310/1/2013 PART
DetailsAndy J. Long
BMPs implemented and site is in acceptable condition. Need to restrict access to cement washout and bare areas due to some track out issues on Pine Nut and Evening Star. Called RP to give verbal notice
General Inspection8/1/20138/1/20138/1/2013 FAIL
DetailsKimberly M. Johnson
Written Correction Notice: to amend ECP project schedule. Not even close to final completion. Trash needs cleaned up; Needs dust control where pulling from stockpile. Maintain street sweeping as needed; improve construction exits as neccessary (50' min, clean 2' plus rock); Concrete washout needs improvement ; Evidence of runoff running toward street from pump truck on ground by existing washout location; Post ESC sign
BMP Violation5/29/20135/30/20135/30/2013APART
DetailsClint A Smith
activily cleaning up
BMP Violation5/29/20135/29/20135/29/2013PFAIL
DetailsClint A Smith
C/N posted;
Clean up all hard surfaces of all sediment and debris. Provide inlet protection on all un protected stormdrains. Must be complete by the end of the day. Will re-inspect on 5/30/2013
BMP Violation4/9/20134/11/20134/15/2013APASS
DetailsClint A Smith
BMP Violation4/5/20134/8/20134/9/2013AFAIL
DetailsClint A Smith
C/N given to RP:
Re-install silt fence in the north section per industry standards.
Post ESC sign where visable from the street.
Maintain construction access on the east side of the project.
**Failure to comply with the given notice, will result in further enforcement. Will re-inspect on 04/11/13.
Site Preparation4/5/20134/5/20134/5/2013 FAIL
DetailsClint A Smith
Verbal to RP;
Re-install perimeter controls (silt fence) per industry standards. Re-establish a stabilized construction access. Will follow up on 4/8/2013