General Inspection | 3/7/2014 | 3/7/2014 | 3/7/2014 | | DONE |
Evan Jenkins
|
|
|
see final
|
DOC - Permit Finaled | 3/7/2014 | 3/7/2014 | 3/7/2014 | P | PASS |
Evan Jenkins
|
|
|
Walked the SIte: Complete No ESC Issues
|
General Inspection | 1/20/2014 | 1/20/2014 | 1/20/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 | | PART |
Evan Jenkins
|
|
|
Contacted Chris Jensen via cell then talked verbally about sweeping up along Broad St. Also, contain power washing waters from entering the seepage bed from power washing sides of buildings. Verbal Warning
|
General Inspection | 8/28/2013 | 8/28/2013 | 8/28/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 7/10/2013 | 7/10/2013 | 7/10/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Maintain washout area. Contain the mortar mixing area as well.
|
Site Preparation | 5/10/2013 | 5/21/2013 | 5/16/2013 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 5/10/2013 | 5/10/2013 | 5/10/2013 | | DONE |
Clint A Smith
|
|
|
Work will not begin until the 21st of May due to the 14 waiting period with the NOI filing. Will re-inspect on 5/21/2013
|
General Inspection | 12/3/2013 | 12/3/2013 | | | |
Dave Hannah
|
|
|
|