General Inspection | 11/29/2013 | 11/29/2013 | 11/29/2013 | | PASS |
Andy J. Long
|
|
|
Finaled. See activity notes.
|
DOC - Permit Finaled | 11/29/2013 | 11/29/2013 | 11/29/2013 | P | PASS |
Andy J. Long
|
|
|
Grass has taken root and landscaping complete. All permits finaled, house is occupied. ESC conditions satisfied.
|
General Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 | | PASS |
Evan Jenkins
|
|
|
Vegetation Re-establishment hasn't reached 70% yet
|
General Inspection | 9/24/2013 | 9/24/2013 | 9/24/2013 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/21/2013 | 8/21/2013 | 8/22/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 7/17/2013 | 7/17/2013 | 7/17/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/14/2013 | 6/14/2013 | 6/14/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Contractor put in stabilized access road up driveway to house using pitrun but removed the stabilized construction access. Monitor for trackout issues.
|
BMP Violation | 5/7/2013 | 5/10/2013 | 5/10/2013 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/6/2013 | 5/6/2013 | 5/7/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP; Install permeter controls at the back of the exsisting lot. Install a stabilized construction exit. Re-install sediment controls at the access point per the industry standards. Will follow up on 5/10/2013
|