Site Final | 12/5/2013 | 12/5/2013 | 12/5/2013 | P | DONE |
Evan Jenkins
|
|
|
dan Phone #: ###-#### see final
|
DOC - Permit Finaled | 12/5/2013 | 12/5/2013 | 12/5/2013 | P | PASS |
Evan Jenkins
|
|
|
Construction still ongoing Will not disturb vegetation
|
General Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 | | PASS |
Andy J. Long
|
|
|
No ESC corrections at this time. No track out, BMPs including DI protection on Woody Lane provided. WIP
|
General Inspection | 9/11/2013 | 9/11/2013 | 9/11/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 7/24/2013 | 7/24/2013 | 7/24/2013 | P | PART |
Kimberly M. Johnson
|
|
|
Verbal to RP: Stabilize stockpile in back; write in correct. DI along Woody has filter fabric; will need approved DI protection before rainy season. Filter fabric in DI must be replaced with approved DI BMP if construction is still active in rainy season; okay for now. Job site is clean.
|
Site Preparation | 6/3/2013 | 6/3/2013 | 6/4/2013 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/3/2013 | 6/3/2013 | 6/4/2013 | P | CANC |
Clint A Smith
|
|
|
Duplicate
|
Site Preparation | 5/16/2013 | 5/16/2013 | 5/16/2013 | | PASS |
Clint A Smith
|
|
|
|