Site Final | 11/19/2013 | 11/19/2013 | 11/19/2013 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 11/19/2013 | 11/19/2013 | 11/19/2013 | P | PASS |
Dave Hannah
|
|
|
|
Tracking Control | 10/29/2013 | 10/29/2013 | 10/29/2013 | A | PASS |
Andy J. Long
|
|
|
Reinspection of site after call from RP Jason regarding corrections requested. Mud on State Street gutter has been scooped up. No other corrections at this time. Installing perimeter landscaping at time of inspection.
|
Site Preparation | 10/29/2013 | 10/29/2013 | 10/29/2013 | P | PASS |
Andy J. Long
|
|
|
see activity notes for case, Corrections have been made.
|
Random Inspection | 10/28/2013 | 10/28/2013 | 10/28/2013 | P | FAIL |
Andy J. Long
|
|
|
Need BMPs along State Street. Mud in the gutter from disturbance. Called RP Jason to issue first verbal Correction Notice
|
General Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 | | PASS |
Andy J. Long
|
|
|
Work in progress. No track out, permit posted on west fence. Approved
|
General Inspection | 8/22/2013 | 8/22/2013 | 8/22/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 7/2/2013 | 7/2/2013 | 7/2/2013 | | NR |
Clint A Smith
|
|
|
|